
5
Specifications
Gas Connection
Gas supply connection point is located at rear of appliance, approximately 60mm from left hand side,
305mm from rear, 125mm from floor and is reached from beneath appliance. (Refer to ‘Dimensions’
section).
Connection is ¾" BSP male thread.
Electrical Supply Requirements
Electrical supply connection point is located at rear of appliance, approximately 74mm from left hand
side, 574mm from rear of appliance and 290mm from floor.
BP8080G / BP8120G -
220-240V a.c, 50 / 60Hz, 0.1kW, 1P+N+E.
BP8080GE /BP8120GE -
220-240V a.c, 50 / 60Hz, 0.35kW, 1P+N+E.
Water Supply Requirements
Cold water connection is
1
/
2
" tube connection via 15mm crox fitting located 280mm from LH side, 574mm
from rear and 240mm from floor.
Water supply must be protected by an 'In-Line' sediment filter / strainer, which should be fitted into
pipeline prior to Bratt Pan water connection.
Maximum water supply pressure 550kPa (80psi).
Maximum water inlet temperature - 80°C.
Summary of Contents for BP8080G
Page 8: ...6 Dimensions Dimensions BP L 8080G...
Page 10: ...8 Dimensions Dimensions BP L 8120G...
Page 32: ......