WAGO I/O System 750
Commissioning 75
750-482/000-001 2AI 4-20mA HART NAMUR NE43
Manual
Version 1.0.2
Depending on the entry “<M01_Ch01>...HART DTM*” or
“<M01_Ch01>...HART DTM*” will be added in the tree structure.
If a HART device is connected to both channels, carry out these steps for
the first channel and then again in a similar manner for the second channel.
22. Move the mouse to the entry for the channel to which your HART device is
connected in the tree structure, select it by clicking with the left mouse
button, and then click
Set up connection
on the
Device
menu. This entry
will now be changed to italics in the tree structure.
If a HART device is connected to both channels, carry out these steps for
the first channel and then again in a similar manner for the second channel.
23. Move the mouse once again to the entry for the communications DTM in
the tree structure and select it by clicking with the left mouse button.
Next go to
More functions
on the
Device
menu and click on
Device list
on the sub-menu.
A dialog window with a list of devices will open.
Click on
[Update List].
After a while the DTM(s) for the connected HART devices will be shown in
green.
Figure 28: Dialog Window Device List, Update
24. Move the mouse to the entry for the channel to which your HART device is
connected in the tree structure and double-click it; a dialog window with the
online parameterization will then open. After a short time, connection
symbols will be displayed after the respective parameters.