Operating manual Pneumatic double diaphragm pump ZIP52 (PF Eco) Finishing
7 Operation
36
Order number 2332848 | Edition 08/2020
Info
Control air pressure is still present.
NOTICE
Hardened working product in the spraying system when 2K product is processed!
Using 2K materials can destroy the pump and spraying system.
4
Observe the manufacturer's processing rules, particularly in regards to the pot life.
4
Flush thoroughly before the end of the pot life.
4
The pot life is decreased by warmth.
7.5 BASIC FLUSHING
Regular flushing
– Regular flushing, cleaning and maintenance ensures the pump's high conveying and
suction capacity.
– The cleaning and flushing agents used must be compatible with the working material.
WARNING
Incompatibility of cleaning/flushing agent and working medium!
Risk of explosion and danger of poisoning by toxic gases.
4
Examine the compatibility of the flushing and cleaning agents and working media
on the basis of the safety data sheets.
B_06949
8
1
3
2
3
8
1
5
4
5
6
6
7
7
9
9
A
B
A
closed
B
open
Preparation
1. Visual check: personal safety equipment, grounding and all devices ready to use.
2. Place empty, grounded tank (7) under the return tube (6).
3. Place the suction hose (7) in the grounded tank with flushing agent (8).