4
T 25 K
GB
Putting device in operating position
Pull back latching bolts (1, fig. 2).
Take up position (2) in front of the device.
Hold device (3) with handle and pull slowly in the direction of
the arrow.
Achtung
Caution: Remember the weight of the device.
Make sure that the latching bolts (4) engage in trolley frame
(5).
1
5
4
3
2
Remove linch pin (1, fig. 3) for securing the mixing pipe.
Take mixing pipe (2) and swivel forwards.
2
3
1
Pull mixing pipe forwards.
Swivel mixing shaft (3, fig. 3) into the transport shaft. Push
mixing pipe onto connection (4, fig. 4) on the device and se-
cure with the two toggle-type fasteners (5).
5
4
Transport by crane
Straps or ropes (not wire cables) should be used for trans-
porting the device by crane. Minimum carrying power 250
kg. Only transport by crane with empty container.
1
0
2
Autom.
Aus
Hand
Summary of Contents for T 25 K
Page 18: ...18 T 25 K GB ...
Page 19: ...19 T 25 K GB ...