EN
Operation
AirConServiceCenter
90
After each process has been performed, a service report is printed.
1. Start by fitting the connections of the AirConServiceCenter to the
vehicle air conditioning system, and opening them.
2. In the basic menu, use the cursor keys
or
to select
“Free
selection”
:
3. Press
ENTER
to confirm.
4. Enter the vehicle data and press
ENTER
to confirm.
8.7.1
Recovery phase
1. Enter the preferred settings and press
ENTER
to confirm.
2. If
“Rec/Recycling phase”
has been selected, enter the preferred
waiting time for the pressure increase (standard is 5 min.) in the
following menu and press
ENTER
to confirm, otherwise continue
with chapter “Vacuum process” on page 90.
I
8.7.2
Vacuum process
1. Enter the preferred settings and press
ENTER
to confirm.
2. If
“Vacuum phase”
has been selected, enter the preferred vacuum
time (standard is 20 min.), otherwise continue with chapter “Filling
process” on page 91.
3. Use the cursor key
to enter the vacuum phase time.
Short selection
Free selection
Other selections
ENTER-OK
Rec/Recycling
Yes
phase?
No
ENTER-OK STOP-EXIT
Pressure increase
Test time
min.
5
ENTER-OK STOP-EXIT
NOTE
The waiting time ensures that any residual refrigerant vaporises and
can then be extracted. The vaporising residual refrigerant triggers an
increase in pressure.
Vacuum phase
Yes
No
ENTER-OK STOP-EXIT
Summary of Contents for ASC2300G
Page 2: ......