EN
107
ASC 2500 G LE / ASC 3500 G LE
Operation
8.8.4
Selecting connections
1. Select the parameters in accordance with the air conditioning system
connections:
– Air conditioning system has a high pressure and a low pressure
connection: Select
LP / HP
.
– Air conditioning system only has a high pressure connection:
Select
HP
.
– Air conditioning system only has a low pressure connection:
Select
LP
.
2. Press
ENTER
to confirm.
3. Once all settings have been entered, press
ENTER
to start the
process.
8.8.5
After ending the air conditioning service
✓
After the air conditioning service has finished, you will be prompted to
disconnect the hoses of the AirCon Service Center from the vehicle air
conditioning system.
1. Disconnect the service hoses (
11
) and (
12
) and press
ENTER
to
confirm.
✓
The service hoses will now be drained. The device is then ready for
further use.
2. Screw the valve caps of the air conditioning system back on the
connections.
HP/LP
PORT
HP
PORT
LP
PORT
ENTER-OK STOP-EXIT
Process start?
ENTER-OK STOP-EXIT
WaecoASC2500GLE-ASC3500GLE_OPM_4445102714_EMEA(de-en-es-fr-ru)_202x-xx-xx.book Seite 107 Freitag, 17. Juli 2020 8:08 20