
WM 90 Repair
Reassembly Procedures
wc_tx000389gb.fm
71
8.20 Break-in Operation
A new engine or one that has been completely overhauled by being
fitted with a new piston, rings, valves, and connecting rod should be
thoroughly run-in before being put into service.
Good bearing surfaces and running clearances between the various
parts can only be established by operating the engine under reduced
speed and loads for a short period of time.
Run-in the engine according to the schedule below. During the run-in
period, check for oil leaks, make final carburetor adjustments, and
regulate the engine operating speed.
Step
Engine Load
Speed (rpm)
Duration (min.)
1
No load
2500
10
2
No load
3000
10
3
No load
3600
10
4
0.7 kW (1.0 hp)
3000
30
5
1.0 kW (1.9 hp)
3600
60
Summary of Contents for WM 90
Page 1: ...www wackergroup com Engine WM 90 REPAIR MANUAL 0160157en 002 0207 0 1 6 0 1 5 7 E N...
Page 2: ......
Page 17: ...WM 90 Repair Safety Information wc_si000143gb fm 17 2 4 Label Locations...
Page 34: ...Theory of Operation WM 90 wc_tx000388gb fm 34 4 9 Cross Section Along Shaft 1 4 10 14 g...
Page 90: ...Recoil Starter WM 90 Repair wc_tx000627gb fm 90 wc_gr002882 a d e b c...
Page 102: ...Troubleshooting WM 90 Repair wc_tx000393gb fm 102 Notes...
Page 107: ......