![Wacker Neuson PV 35A Operator'S Manual Download Page 18](http://html1.mh-extra.com/html/wacker-neuson/pv-35a/pv-35a_operators-manual_3326508018.webp)
PV 35A
Maintenance
wc_tx000755gb.fm
18
4.
Maintenance
4.1
Periodic Maintenance Schedule
The chart below lists basic machine and engine maintenance. Refer to
your engine operator’s manual for additional information on engine
maintenance.
Daily
before
starting
After
first
10 hrs.
After
first
25 hrs.
Every
50
hrs.
Every
100
hrs.
Every
300
hrs.
Check fuel level.
Check engine oil level.
Inspect air filter. Replace as needed.
Change engine oil.
Clean air cleaner.
Check engine cooling fins
(if equipped).
Check and clean spark plug.
Check fuel filter.
Clean fuel tank.
Clean spark arrester (if equipped).
Check and adjust valve clearance.
Summary of Contents for PV 35A
Page 1: ...Handheld Gas Vibrator PV 35A OPERATOR S MANUAL 0171882en 002 0708 0 1 7 1 8 8 2 E N...
Page 2: ......
Page 9: ...Safety Information PV 35A wc_si000224gb fm 9 Notes...
Page 10: ...PV 35A Safety Information wc_si000224gb fm 10 2 5 Label Locations wc_gr004853...
Page 17: ...Operation PV 35A wc_tx000754gb fm 17 Notes...
Page 29: ......