Maintenance
PT 2/3 /...
wc_tx000013gb.fm
42
5.18 Storage
If pump is being stored for more than 30 days:
NEVER open priming plug, discharge plug, or cover when pump is hot.
5.18.1
Remove discharge plug from pump casing and drain out any water left
in the housing after pump has cooled.
5.18.2
Remove pump cover and clean inside of pump housing. Coat inside of
pump with a light film of oil to reduce corrosion. A spray can of oil works
well for this.
5.18.3
Tape up suction and discharge ports to prevent anything from falling
into pump.
5.18.4
Change engine oil and follow procedures described in engine manual
for engine storage.
5.18.5
Cover pump and engine and store in a clean, dry area.
5.19 Accessories
Wacker offers a complete line of fittings, hoses, and clamps to properly
connect the pump to match various job conditions.
WARNING
Summary of Contents for PT 3
Page 1: ...Pump PT 3 OPERATOR S MANUAL 0155951en 005 0107 0 1 5 5 9 5 1 E N...
Page 2: ......
Page 20: ...Operation PT 2 3 wc_tx000012gb fm 18...
Page 41: ...PT 2 3 Maintenance wc_tx000013gb fm 39...
Page 46: ...Maintenance PT 2 3 wc_tx000013gb fm 44 Notes...
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......