![Wacker Neuson PST2-400 Operator'S Manual Download Page 16](http://html1.mh-extra.com/html/wacker-neuson/pst2-400/pst2-400_operators-manual_3226331016.webp)
Operation
PST2/PSTF2 400
wc_tx000111gb.fm
16
See Graphic: wc_gr000242
Cable Assembly
If it is necessary to extend the cable assembly, use a core size equal
to or larger than the original. This is necessary not only to avoid a
performance drop, but to prevent cable overheating which can result in
fire, electrical leakage or electrical shock.
If a cable with cut insulation or other damage is submerged in the
water, there is a danger of damage to the pump, electrical leakage,
electrical shock, or fire.
Be careful not to let the cable assembly be cut or become twisted. This
may result in damage to the pump, electrical leakage, electrical shock,
or fire.
If it is necessary to submerge the connection wires of the cable
assembly in water, first seal the wires completely in a molded
protective sleeve, to prevent electrical leakage, electrical shock, or fire.
Do not allow the cable assembly wires or power supply plug to become
wet.
Make sure the cable does not become excessively bent or twisted, and
does not rub against a structure in a way that might damage it.
If used in a deep-well installation, the cable assembly should be
secured every twenty feet.
CAUTION
Summary of Contents for PST2-400
Page 4: ...Foreword wc_tx001173gb fm 4...
Page 6: ...Table of Contents PST2 PSTF2 400 wc_bo0154618en_005TOC fm 6...
Page 14: ...Operation PST2 PSTF2 400 wc_tx000111gb fm 14 Notes...
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......