Operation
PD 2A/3A
wc_tx000228gb.fm
20
4.4
Priming Pump
See Graphic: wc_gr001064
Diaphragm pumps are self priming and seldom need to have water
added to them before starting. However, if the pump has not been
used for several weeks and the rubber valves inside it are dry, adding
water through the surge chamber
(f)
will help the valves seal and
shorten the amount of time required for the pump to prime.
4.5
Before Starting
See Graphic: wc_gr001064
4.5.1
Read safety instructions at the beginning of manual.
4.5.2
Place pump as near to water as possible, on a firm, flat, level surface.
4.5.3
Check that hoses are securely attached to pump. Suction hose
(c)
must not have any air leaks. Check that all hose clamps
(b)
and
couplings
(a)
are tight. Check that cap on surge chamber
(f)
is tight.
4.5.4
Check that discharge hose
(e)
is not blocked. Lay hose out as straight
as possible. Remove any twists or sharp bends from hose which may
block the flow of water.
Note:
Operating the pump with any part of the discharge line
positioned higher than 7.5 m (25 ft.) above the pump can cause
backflow into the pump and damage pump components.
4.5.5
Make sure suction strainer
(d)
is clean and securely attached to end of
hose. The strainer is designed to protect the pump by preventing large
objects from being pulled into the pump.
Position strainer so it will remain under water as water level drops.
4.5.6
Check fuel level, engine oil level, and condition of air cleaner.
w c _ g r 0 0 1 0 6 4
A
>
=
B
=
>
?
>
@
Summary of Contents for PDT 2A
Page 1: ...Pump PDT 2A PDI 2A PDT 3A PDI 3A OPERATOR S MANUAL 0154614en 006 0309 0 1 5 4 6 1 4 E N...
Page 2: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......