![Wacker Neuson EH 25 Operator'S Manual Download Page 32](http://html1.mh-extra.com/html/wacker-neuson/eh-25/eh-25_operators-manual_3315723032.webp)
10 Maintenance
32
10.2
Maintenance schedule
10.3
Maintenance work
Task
Daily
before
operation
Every
20 hrs.
Monthly
Check power cable for perfect
condition – if power cable is
defective, have it replaced. *
* Have these tasks carried out by the service department of your Wacker
Neuson contact person.
Visual inspection of all parts
for damage.
Clean the machine.
Ventilation slots.
Check the tool end and
cutting edge – if required,
sharpen, reforge or replace
(have it replaced).
Lubricate the machine.
Check tool holder for wear –
have it changed, if
necessary. *
WARNING
Electrical voltage.
Injuries from electrocution.
f
Remove the plug from the plug receptacle before all work on the machine.
Summary of Contents for EH 25
Page 1: ...Operator s manual Electric hammer EH 25 65 75 04 2011 0226245en 003...
Page 48: ...15 Glossary 48...
Page 50: ......
Page 51: ...Certificate...
Page 52: ......
Page 53: ......
Page 54: ......