![Wacker Neuson EH 25 Operator'S Manual Download Page 25](http://html1.mh-extra.com/html/wacker-neuson/eh-25/eh-25_operators-manual_3315723025.webp)
8 Transport
25
8
Transport
Performing preparations
1. Pull the plug from the plug receptacle.
2. Let machine cool off.
3. Remove tool.
4. Wind up the power cable.
Transporting the machine
5. Lift machine with the supplementary handle.
6. Place the machine on or into a suitable transport vehicle.
7. Secure the machine against falling over and down or sliding.
Note:
Wacker Neuson recommends to use the truck for the transport on the
construction site, refer to chapter
Accessories
.
WARNING
Improper handling can result in injury or serious material damage.
f
Read and follow all safety information of this operator's manual, see chapter
Safety
.
Summary of Contents for EH 25
Page 1: ...Operator s manual Electric hammer EH 25 65 75 04 2011 0226245en 003...
Page 48: ...15 Glossary 48...
Page 50: ......
Page 51: ...Certificate...
Page 52: ......
Page 53: ......
Page 54: ......