![Wacker Neuson CRT 36-25 Operator'S Manual Download Page 34](http://html2.mh-extra.com/html/wacker-neuson/crt-36-25/crt-36-25_operators-manual_3126424034.webp)
wc_tx000640gb.fm
34
Maintenance
CRT 36
4.8
Transporting the Machine
ALWAYS
turn the engine off and remove the key from the machine before moving
or transporting machine.
To hoist the trowel:
Attach a sling or chains through the lifting bars
(a)
on each side of the seat
pedestal.
NOTICE:
Make sure the lifting device has enough weight-bearing capacity to lift
machine safely. Refer to section
Technical Data.
DO NOT
lift the trowel by the guard rings or any part of the trowel other than the
lifting fixture, as the component may fail, causing the trowel to fall, possibly injuring
bystanders.
If equipped with the optional integrated wheel kit (b):
From the rear of machine, use the jack handle to raise the blades off the ground
76-102 mm (3-4 in.). Push the machine using the upper frame.
WARNING
WARNING
Summary of Contents for CRT 36-25
Page 1: ...5200001020 03 0515 5 2 0 0 0 0 1 0 2 0 Operator s Manual Ride On Trowel CRT 36 25 CRT 36 26A...
Page 6: ......
Page 15: ...CRT 36 Labels wc_si000378gb fm 15 2 Labels 2 1 Label Locations C D B J...
Page 16: ...Labels CRT 36 16 wc_si000378gb fm...
Page 21: ...wc_tx000639gb fm 21 CRT 36 Operation 3 Operation 3 1 Features and Controls...
Page 51: ...wc_tx001324gb fm 51 CRT 36 Schematics 7 Schematics...
Page 53: ......
Page 66: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1...
Page 67: ......