![Wacker Neuson BS 50-2 Operator'S Manual Download Page 15](http://html1.mh-extra.com/html/wacker-neuson/bs-50-2/bs-50-2_operators-manual_3226314015.webp)
Table of Contents
Rammer
wc_bo5200016051_0
8
_FM10T
15
Foreword
3
EC Declaration of Conformity
7
1
Safety Information
17
1.1
Signal Words Used in this Manual ..................................................... 17
1.2
Machine Description and Intended Use ............................................. 18
1.3
Safety Guidelines for Operating the Machine ..................................... 19
1.4
Safety Guidelines for Lifting and Transporting the Machine ............... 20
1.5
Service Safety .................................................................................... 21
1.6
Operator Safety while Using Internal Combustion Engines ............... 23
2
Labels
24
2.1
Label Locations .................................................................................. 24
2.2
Label Meanings .................................................................................. 25
3
Lifting and Transporting
30
3.1
Lifting the Rammer ............................................................................. 30
3.2
Transporting the Rammer .................................................................. 31
4
Operation
34
4.1
Preparing the Machine for First Use ................................................... 34
4.2
Recommended Fuel ........................................................................... 35
4.3
Refueling the Machine ........................................................................ 37
4.4
Filling the Oil Tank .............................................................................. 38
4.5
Purging the Oil Lines .......................................................................... 39
4.6
Position of the Operator ..................................................................... 41
4.7
Before Starting ................................................................................... 41
4.8
Starting, Operating, and Stopping the Machine ................................. 42
4.9
Emergency Shutdown Procedure ....................................................... 44
4.10
Selecting and Adjusting the Ramming Stroke—BS 65-V ................... 45
4.11
Optional Equipment ............................................................................ 48
5
Maintenance
49
5.1
Maintaining the Emission Control System .......................................... 49
5.2
Periodic Maintenance Schedule ......................................................... 50
5.3
Servicing the Air Cleaner .................................................................... 51
Summary of Contents for BS 50-2
Page 6: ...wc_tx003550gb_FM10 fm 6 Rammer Foreword Notes...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 33: ...wc_tx003551gb_FM10 fm 33 Rammer Lifting and Transporting Notes...