![WACKER Group CT 30 Series Repair Manual Download Page 20](http://html1.mh-extra.com/html/wacker-group/ct-30-series/ct-30-series_repair-manual_3143699020.webp)
2-10
2
GUIDE HANDLE
TROWEL REPAIR
7. Check movement of handle. Handle should be able to
move with some resistance. Adjust nut as necessary.
8. Reinstall cover
(b)
over assembly using M6 screws
(a)
. Torque to 7 ft.lbs. (10 Nm).
9. Slide pitch control cable through handle and insert
Pro-Shift
®
assembly.
10. Apply Loctite 243 or equivalent to M6 screw
(c)
and reinstall in handle. Torque to 6 ft.lbs. (8 Nm).
11. Push
Pro-Shift
®
handle fully forward.Thread cable
through handle base
(d)
and over pulley
(f)
. Slide
handle into base.
12. Apply Loctite 243 or equivalent and attach two M8
screws
(e)
to handle. Torque to 16 ft.lbs. (22 Nm).
13. Install hitch pin into handle.
14. Thread control cable
(g)
through fork
(h)
. Adjust
retaining nuts
(j)
until cable is snug and trowel
blades lay flat (0
°
pitch).
1001RM04
a
c
b
j
h
g
f
d
e
e
1013SD53
Summary of Contents for CT 30 Series
Page 2: ......
Page 26: ...3 6 3 CLUTCH TROWEL REPAIR Notes...
Page 30: ...4 4 4 SPIDER TROWEL REPAIR Notes...
Page 38: ...5 8 5 DRIVETRAIN TROWEL REPAIR Notes...
Page 40: ...6 2 6 TROWEL REPAIR TROUBLESHOOTING Notes...
Page 43: ......