TROWEL REPAIR
GUIDE HANDLE
2
2-5
Assembly:
1. Place control cable terminal
(k)
into Twist Control
assembly
(j)
. Drive roll pin
(h)
into assembly.
2. Lubricate threads on Twist Control assembly. Slide
cable down into handle. Turn twist control assembly
fully counterclockwise.
3. Place Twist Control assembly into handle, lining up
holes in handle. Attach M6 screw
(m)
to the underneath
of handle.
4. Apply Loctite 243 or equivalent to threads of M6 screw
(g)
. Attach to top of handle. Torque to 6 ft.lbs. (8 Nm).
5. Thread cable through handle base
(b)
and over pulley
(c)
. Slide handle into base.
6. Apply Loctite 243 or equivalent and attach two
M8 screws
(a)
to handle. Torque to 16 ft.lbs. (22 Nm).
7. Thread control cable fork
(e)
and attach retaining nuts
(f)
. Adjust cable nuts until cable is snug and trowel
blades lay flat (0
o
pitch).
Summary of Contents for CT 30 Series
Page 2: ......
Page 26: ...3 6 3 CLUTCH TROWEL REPAIR Notes...
Page 30: ...4 4 4 SPIDER TROWEL REPAIR Notes...
Page 38: ...5 8 5 DRIVETRAIN TROWEL REPAIR Notes...
Page 40: ...6 2 6 TROWEL REPAIR TROUBLESHOOTING Notes...
Page 43: ......