![WAC Lighting Volta 2](http://html1.mh-extra.com/html/wac-lighting/volta-2-led-series/volta-2-led-series_installation-instruction_3124350002.webp)
2
WAC Lighting retains the right to modify the design of our products at any time as part of the company's continuous improvement program. August, 2017
waclighting.com
Phone (800) 526.2588
Fax (800) 526.2585
Headquarters/Eastern Distribution Center
44 Harbor Park Drive
Port Washington, NY 11050
Central Distribution Center
1600 Distribution Ct
Lithia Springs, GA 30122
Western Distribution Center
1750 Archibald Avenue
Ontario, CA 91760
INSTALLATION INSTRUCTION
Volta 2” LED - New Construction Round Housing
R2RNT, R2RCT, R2RNL, R2RCL
HANGER BAR
ROUND CHANNEL
1/2” CHANNEL
3/4” CHANNEL
1 1/2” CHANNEL
FIG.1
FIG.6
FIG.7
FIG.8
DETAIL. A
DETAIL. B
DETAIL. C
FIG.2
FIG.3
FIG.4
FIG.5
Trim Housing Installation
1. Housing features mounting brackets that can be used with hanger bars
or various channel supports (See
FIG. 1-5
).
Adjust the brackets to proper height by loosening the screws such that
the bottom of housing is flush to top of finished ceiling plane
(See
FIG. 6
). Retighten screws securely.
2. Slide the male and female hanger bars or other channel supports
through the appropriate holes in the brackets.
3. A. For hanger bar installation on grid:
Hanger bars are notched on the ends to fit over “T” bars in the suspended
ceilings supported with tie wires (by others) to upper ceiling structure
(See
FIG. 7
).
B. For hanger bar installation on joists:
Install the hanger bar and housing assembly such that the lip of the
hanger bar rests on the bottom surface of the joist. Use a screw-driver
or hammer to secure the “screw-nail” into the wood (See
FIG.8
).
4. Slide the housing along the hanger bars to the desired position
(See
Detail. C
). Tighten bottom locking screws to secure the
housing in place.
Bottom of Housing
Flush to Top of Ceiling
Loosening Screws
to Adjust Brackets
Locking
Screw
Hanger bar lip to rest on