WAC Lighting Volta 2

2

WAC Lighting retains the right to modify the design of our products at any time as part of the company's continuous improvement program.   August, 2017

waclighting.com

Phone (800) 526.2588
Fax       (800) 526.2585

Headquarters/Eastern Distribution Center

44 Harbor Park Drive  
Port Washington, NY 11050

Central Distribution Center

1600 Distribution Ct
Lithia Springs, GA 30122

Western Distribution Center  

1750 Archibald Avenue  
Ontario, CA 91760

INSTALLATION INSTRUCTION

Volta 2” LED - New Construction Round Housing

R2RNT, R2RCT, R2RNL, R2RCL

HANGER BAR

ROUND CHANNEL

1/2”  CHANNEL

3/4”  CHANNEL

1 1/2”  CHANNEL

FIG.1

FIG.6

FIG.7

FIG.8

DETAIL. A

DETAIL. B

DETAIL. C

FIG.2

FIG.3

FIG.4

FIG.5

Trim Housing Installation

1.  Housing features mounting brackets that can be used with hanger bars 

or various channel supports (See 

FIG. 1-5

). 

Adjust the brackets to proper height by loosening the screws such that 

the bottom of housing is flush to top of finished ceiling plane  

(See 

FIG. 6

). Retighten screws securely. 

2.  Slide the male and female hanger bars or other channel supports 

through the appropriate holes in the brackets. 

3.  A. For hanger bar installation on grid: 

Hanger bars are notched on the ends to fit over “T” bars in the suspended 

ceilings supported with tie wires (by others) to upper ceiling structure 

(See 

FIG. 7

). 

 

B. For hanger bar installation on joists: 

Install the hanger bar and housing assembly such that the lip of the 

hanger bar rests on the bottom surface of the joist. Use a screw-driver  

or hammer to secure the “screw-nail” into the wood (See 

FIG.8

). 

4.  Slide the housing along the hanger bars to the desired position  

(See 

Detail. C

). Tighten bottom locking screws to secure the  

housing in place.

Bottom of Housing

Flush to Top of Ceiling

Loosening Screws

to Adjust Brackets

Locking 

Screw

Hanger bar lip to rest on 

bottom surface of joist

Reviews: