Mounting description
Article No. 78590
Lift pit ladder TRI-KLAPP 95
english
parts list
1.
1
twofold articulation ladder with chain
and fold away ground clamp with monitoring switch
foil bag with:
pos.
number
2.
2
dowels 14 x 75
3.
2
screws 10 x 70
4.
2
plain washers 10,5 DIN 9021
5.
8
tapping screw
6. 1
mounting instruction
7.
1
drill d=3,5
8.
2
fi xing hooks
9.
1
twisting
fi tting M20
10.
1
sealing
copound
11
2
labels „Put up site“
1)
Vertical mounting towards the landing door for a pit depth of 1,3-1,5m (preferred solution)
distance between apron and fl oor dowel fi xing
24cm
28 cm
mark dowel drilling
Put the ladder on the fl oor according to the
illustration.
TRI-KLAPP 95
The clamp must be dowelled to the door sill at the correct distance,
so that the ladder can be put up with the required rake of 65°-75°.