primary shaft P-203 into the end of the arbor with the slot straddling the P-117 fiber drive. Install the
three attaching bolts, tightening only the longest bolt.
7)
Tighten the in feed roller sprocket set screw on its shaft flat with the chain in a straight line
position with its mating sprocket.
8)
Check the oil level now in the gear box and fill as needed. It holds 2 oz. Fill to 1/3 full on the oil
cup.
9)
Install the chip deflector. Check to see that all belt guards are in place. Make sure all is clear
inside the arbor area and around the machine.
10)
Start the machine with the attaching bolt wrench ready to loosen the center bolt to make the final
smooth running position check of the power feed unit. Move the unit around within the limits of the
attaching bolt hole clearance and find the quietist running position. This will be when the primary shaft is
most centrally located in the end of the arbor. When this position is found, tighten all three attaching
bolts, starting with the central one.