VWR Peqlab Cast-It Instruction Manual Download Page 5

Instruction Manual Cast-It™ Gel CASTER 

VWR_v0617_E

 

2

 

ASSEMBLING GEL PLATES FOR CASTING 

 
 
 
 
 
 
 
 

 

 

Picture 1: Invert casting base. 

 
 
 
 
 
 
 
 
 
 

 

 

Picture 2: Place gel assembly. 

 
 
 
 
 
 
 
 
 
 

 

 

Picture 3: Turn handles. 

 

 
 

 

See  Table  1  for  volumes  of  acrylamide  mixture  needed.  Pour  gel  solution  slowly  to  avoid  any 
bubbles. When gel is poured place comb at top to create wells.  

 

Remove gels from the Cast-It™ center unit and place them into the electrophoresis chamber. 

 

Table 1: 

Unit  

Twin S 

Twin M 

Twin ExW S  Twin L 

0.8 mm spacer    8 ml 

18 ml 

16 ml 

32 ml 

1.5 mm spacer  15 ml 

34 ml 

30 ml 

60 ml 

 

 

The center unit of the Cast-It™ is attached to the casting 
base with safety cams and slot arrangement. 

 

For casting gels remove the center unit from the base. 

 

Invert casting base (picture 1). 

 

Place the center of the Cast-It™ on the inverted casting 
base.  The  notches  of  the  center  unit  need  to  lock  into 
the four acrylic squares on the underside of the casting 
base.  Arrange  a  gel  assembly  including  a  notched 
glass plate, side spacers and a blank glass plate. Place 
the assembly onto one side of the center unit. Slide the 
side  clamps  over  the  assembly  and  tighten  the  screws 
(picture  2).  DO  NOT  OVERTIGHTEN.  Place  a  second 
gel assembly on the other side. If you only want to cast 
one gel, place a blank glass plate or a blocking plate, 
on the other side. The bottom of the glass plates needs 
to sit flat on the acrylic squares of the inverted casting 
base to obtain a good seal. Remove the center unit and 
turn around the casting base. 

 

Wet silicone mats with e.g. water or buffer to prolong 
their life span. 

 

Place  the  center  unit  onto  the  casting  base.  Insert  the 
casting  cams  (with  handles  pointing  up)  into  the  holes 
in  the  center  unit.  Simultaneously,  turn  cams  one  half 
turn  to  tighten  the  assembly  onto  the  gasket  of  the 
casting base. 

 

Once the glass plates are secured into the casting base 
the  gel  may  be  poured.  (An  initial  leak  test  using  a 
small amount of water is recommended - add 2 - 3 ml 
of  water  and  let  stand  for  2  minutes.  If  no  leakage  is 
visible,  remove  water  and  proceed  with  gel  casting.  If 
leakage occurs, take assembly apart and try again.) 

Summary of Contents for Peqlab Cast-It

Page 1: ...Instruction Manual Bedienungsanleitung Cast It Gel CASTER Cast It Gelgie stand...

Page 2: ......

Page 3: ...ruction Manual Cast It Gel CASTER VWR_v0617_E CONTENT WARRANTY 1 PACKAGING LIST 1 ASSEMBLING GEL PLATES FOR CASTING 2 BUFFERS AND SOLUTIONS 3 TROUBLESHOOTING 4 TECHNICAL SUPPORT AND ORDERING INFORMATI...

Page 4: ...to the instruction manual if not agreed differently No liability is accepted for loss or damage arising from incorrect use VWR s liability is limited to the repair or replacement of the unit or refund...

Page 5: ...hed glass plate side spacers and a blank glass plate Place the assembly onto one side of the center unit Slide the side clamps over the assembly and tighten the screws picture 2 DO NOT OVERTIGHTEN Pla...

Page 6: ...olution of electrophoresis buffer by dissolving 15 1 g Tris base and 94 g glycine in 900 ml of deionized H2O Add 50 ml of a 10 stock solution of SDS electrophoresis grade and adjust the volume to 1000...

Page 7: ...so wet silicone mats with e g water or buffer before placing the center unit onto the casting base to prolong their life span Skewed bands Gel has not polymerized properly at wells De gas gel solution...

Page 8: ...ment gaskets for upper buffer chamber S PEQL45 1010 GK Side clamps 2 side clamps for fixation of glass plates PEQL45 1010 CL Wing screws 2 wing screws for fixation of side clamps PEQL45 1010 WK Notche...

Page 9: ...cm wide 3 pieces PEQL45 1614 SD 0 8 mm 1 0 cm wide 3 pieces PEQL45 1614 SC volumes are calculated for a well length of 20 mm PerfectBlue Double Gel System Twin L Item Description Cat No Double gel sys...

Page 10: ...tched glass plate clear 20 x 10 x 0 30 cm PEQL45 2010 10R Blank glass plate clear 20 x 10 x 0 30 cm PEQL45 2010 10G Standard combs 1 5 mm 10 teeth 305 l PEQL45 2010 10D 1 5 mm 15 teeth 185 l PEQL45 20...

Page 11: ...anleitung Cast It Gelgie stand VWR_v0617_D 8 INHALT GARANTIE 9 LIEFERUMFANG 9 ZUSAMMENBAU DER GLASPLATTEN ZUM GIE EN 10 PUFFER UND L SUNGEN 11 TROUBLESHOOTING 12 TECHNISCHER SERVICE UND BESTELLINFORMA...

Page 12: ...d keine anderslautende Vereinbarung besteht Anspr che auf Ersatz oder Reparatur die aus einer fehlerhaften Verwendung entstanden sind werden nicht erf llt Die VWR GmbH verpflichtet sich zur Reparatur...

Page 13: ...s verbunden Entfernen Sie zum Gie en der Gele das Mittelteil aus der Gie basis Invertieren Sie die Gie basis Abbildung 1 Platzieren Sie das Mittelteil auf der invertierten Gie basis Die Aussparungen d...

Page 14: ...mM Glycin Elektrophoresegrad pH 8 3 0 1 SDS Bereiten Sie eine 5 x Stamml sung des Elektrophoresepuffers vor indem Sie 15 1 g Tris und 94 g Glycin in 900 ml deionisiertem H2O aufl sen F gen Sie 50 ml e...

Page 15: ...en Klebkraft auf der Gie basis sitzen und somit ohne Aufwand ab und aufgesetzt werden k nnen Bitte beachten Sie dass das Anfeuchten der Dichtungen mit Wasser oder Puffer vor dem Aufsetzen des Mittelte...

Page 16: ...Ersatzdichtungen 2 Ersatz Gummidichtungen f r Mittelteil S PEQL45 1010 GK Seitenklemmen 2 Seitenklemmen zum Befestigen der Gelplatten PEQL45 1010 CL Fl gelschrauben 2 Fl gelschrauben zum Fixieren der...

Page 17: ...St ck PEQL45 1614 SD 0 8 mm 1 0 cm breit 3 St ck PEQL45 1614 SC Taschenvolumen ist kalkuliert f r eine Taschentiefe von 20 mm PerfectBlue Doppelgelsystem Twin L Artikel Beschreibung Bestell Nr Doppel...

Page 18: ...ten Farbe klar Ma e B x L x D 20 x 10 x 0 30 cm PEQL45 2010 10R Glasplatte normal Farbe klar Ma e B x L x D 20 x 10 x 0 30 cm PEQL45 2010 10G Standardk mme 1 5 mm 10 Z hne 305 l PEQL45 2010 10D 1 5 mm...

Page 19: ...Bedienungsanleitung Cast It Gelgie stand VWR_v0617_D 16 NOTIZEN...

Page 20: ......

Reviews: