5-2
ULT Freezer
VWR International
Section 5
Factory Installed Options
5. Go to the interior and seal around the injection assembly with
Permagum.
6. Install the transfer hose connecting one end to the injection assembly,
the other end to the solenoid valve. Install the solenoid valve to the
supply source. The solenoid mounting bracket is not required and may
be discarded.
Note
When selecting a CO
2
supply cylinder, it must be equipped with a
siphon tube.
s
1. Plug the solenoid/probe connector into the BUS connection. Loop the
probe wire back into the base/side car. Secure the connector with a
screw on the ends of the connector. The connector is keyed.
2. Route the temperature probe through the probe port. The probe port is
located in the upper right corner (viewed from the side) of 12.7 and 20
cu. ft. models, and in the lower right corner (viewed from the back) of
3.0 cu. ft. models.
3. Carefully remove the existing Permagum sealant from around the probe
port opening.
Figure 5-2.
Injection Assembly
Install Temperature Probe
Figure 5-3.
Probe and Solenoid Connections
Install Injection Assembly
(continued)
Summary of Contents for 5700 Series
Page 19: ......
Page 21: ......
Page 41: ......
Page 44: ...ULT Freezer 7 1 VWR International Section 7 Parts ...
Page 45: ...7 2 ULT Freezer VWR International Section 7 Parts ...
Page 46: ...ULT Freezer 7 3 VWR International Section 7 Parts ...
Page 59: ......
Page 60: ...ULT Freezer 8 1 VWR International Section 8 Refrigeration Schematics ULT Freezer 8 1 ...
Page 61: ...8 2 ULT Freezer VWR International Section 8 Refrigeration Schematics ...
Page 62: ...ULT Freezer 8 3 VWR International Section 8 Refrigeration Schematics ...
Page 63: ...8 4 ULT Freezer VWR International Section 8 Refrigeration Schematics ...
Page 64: ...ULT Freezer 8 5 VWR International Section 8 Refrigeration Schematics ...
Page 65: ......
Page 66: ...ULT Freezer 9 1 VWR International Section 9 Electrical Schematics ...
Page 67: ...9 2 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 68: ...ULT Freezer 9 3 VWR International Section 9 Electrical Schematics ...
Page 70: ...ULT Freezer 9 5 VWR International Section 9 Electrical Schematics ...
Page 71: ...9 6 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 72: ...ULT Freezer 9 7 VWR International Section 9 Electrical Schematics ...
Page 73: ...9 8 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 74: ...ULT Freezer 9 9 VWR International Section 9 Electrical Schematics ...
Page 75: ...9 10 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 76: ...ULT Freezer 9 11 VWR International Section 9 Electrical Schematics ...
Page 77: ...9 12 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 78: ...ULT Freezer 9 13 VWR International Section 9 Electrical Schematics ...
Page 79: ...9 14 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 80: ...ULT Freezer 9 15 VWR International Section 9 Electrical Schematics ...
Page 81: ......
Page 90: ...VWR International P O Box 5015 Bristol CT 06011 8960 ...