Fig. 11
4.
Reverse procedure to install and check for proper
operation.
CERAMIC-RADIANT BURNER
Shut off the gas before servicing the
unit.
1.
2.
Remove CONTROL VALVE COVER next to rack
lift assembly handle.
3.
Adjust rack assembly to the lowest position to
access the burners.
Ceramic bricks can easily be damaged.
Use care when handling.
4.
Lift ceramic bricks [1] Fig. 12 off the support rails
[2] Fig. 12 for each burner [3] Fig. 12. There are
6 ceramic bricks for each of the 3 burners (18
bricks total).
Fig. 12
5.
Remove screws securing pilot tube mounting
brackets [1] Fig. 13 to burner support [2] Fig.
13. Position pilot tube assemblies out of the way
to the sides.
Fig. 13
6.
Remove screws securing manifold bracket [1]
Fig. 14 to burner support [2] Fig. 14. Allow
bracket to drop down out of the way.
Fig. 14
7.
Loosen screws [1] Fig. 15 (qty 6) by several turns
that secure the burner support [2] and brace [3]
Fig. 15 to broiler frame.
V-SERIES HEAVY DUTY BROILERS, DOUBLE DECK AND RANGE MATCH MODELS - REMOVAL AND
REPLACEMENT OF PARTS
F45548 (0715)
Page 8 of 16