Vulcan-Hart ML-136590 Installation & Operation Manual Download Page 21

— 4

 —

GR

ILL

OIR

S A

U G

AZ

RA

LIT

ÉS

Les

 gr

illo

irs

 au

 ga

z s

ont

 co

nçu

s p

our

 un

 us

age

com

mer

cia

l s

eul

em

ent

 et

 pr

ocu

ren

t u

n c

hau

ffa

ge

rap

ide

 et

 ef

fica

ce.

  C

haq

ue 

brû

leu

r e

st c

om

man

par

 un

 ro

bine

t d

e g

az 

rég

lab

le 

mar

che

/ar

rêt

.

Mod

èle

Nom

bre

 de

Déb

it

 br

ûle

urs

BTU

/h

3 à

 45

 00

0 c

h.

135

 00

0

VS

T4B

BA

LLA

GE

Im

méd

iat

em

ent

 ap

rès

 av

oir 

déb

allé

 l’a

ppa

rei

l,

vér

ifie

r s

’il 

n’a

 pa

s é

té 

end

om

mag

é lo

rs 

du

tra

nsp

ort.

 En

 ca

s d

e d

om

mag

es,

 co

nse

rve

r le

mat

érie

l d

’em

bal

lag

e e

t a

vis

er l

e tr

ans

por

teu

r

dan

s le

s 1

5 jo

urs

 su

iva

nt l

a d

ate

 de

 ré

cep

tio

n.

IN

STA

LLA

TIO

N

Ava

nt d

e p

roc

éde

r à

 l’in

sta

lla

tio

n, s

’as

sur

er q

ue 

le

typ

e d

e g

az 

(na

tur

el o

u p

rop

ane

) d

e l’i

mm

eub

le

ain

si q

ue 

les

 di

men

sio

ns 

de 

dég

age

men

t (v

oir

ci-d

ess

ous

) c

orre

spo

nde

nt a

ux 

spé

cific

atio

ns 

de

la 

pla

que

 si

gna

lét

iqu

e p

lac

ée 

der

riè

re 

la 

rai

nur

e

de 

réc

upé

rat

ion

 de

 la

 gr

aiss

e in

fér

ieu

re.

Em

pla

cem

ent

Pla

cer

 le

 gr

illo

ir 

à l’

em

pla

cem

ent

 pr

évu

.

Auc

une

 s

ubs

tan

ce 

com

bus

tib

le 

ne 

doi

t s

e

tro

uve

r à

  pr

oxi

mité

  de

  l’a

ppa

rei

l. N

e p

as o

bst

rue

r

la 

circ

ula

tio

n d

e l’a

ir n

éce

ssa

ire

 à 

l’a

éra

tio

n e

t à

la 

com

bus

tio

n.  

NE

 PA

S in

sta

lle

r le

 gr

illo

ir p

rès

des

 br

ûle

urs

 dé

cou

ver

ts 

ou 

frit

eus

es.

Dég

age

men

ts 

req

uis

Les

 gr

illo

irs

 do

ive

nt s

e tr

ouv

er d

ans

 un

 en

dro

it

suf

fis

am

men

t e

spa

cé 

pou

r p

erm

ett

re 

leu

r

ent

ret

ien

 et

 le

ur f

onc

tio

nne

men

t a

ppr

opr

iés

.

Un 

dég

age

men

t m

ini

mal

 de

 61

0 m

m (2

4 p

o)

est

 re

qui

s d

eva

nt l

’ap

par

eil.

IN

TR

OD

UC

TIO

N

CO

DE

S D

’IN

STA

LLA

TIO

N E

T

NO

RM

ES

L’in

sta

lla

tio

n d

u g

rill

oir 

doi

t ê

tre

 co

nfo

rm

e

aux

 ex

ige

nce

s s

uiv

ant

es 

:

Aux

 É

tat

s-U

nis

 :

1.

Cod

es 

loc

aux

2.

Nor

me 

AN

SI/Z

223

.1/

NFP

A N

° 5

4 (d

ern

ièr

e

édi

tio

n) d

u N

atio

nal

 Fu

el G

as 

Cod

e d

ont

 on

peu

t s

e p

roc

ure

r u

n e

xem

pla

ire

 au

prè

s d

e

l’A

mer

ica

n G

as 

Ass

oci

atio

n A

ccr

edi

ted

Sta

nda

rds

 C

om

mitt

ee 

Z22

3 a

u 4

00 

N.

Cap

ita

l S

t. N

W, W

ash

ing

ton

, D

C 2

000

1 o

u

aup

rès

 du

 S

ecr

eta

ry 

Sta

nda

rds

 C

oun

cil,

NF

PA

, 1

 B

att

ery

ma

rch

 P

ark

, Q

uin

cy,

MA

 02

169

-74

71.

3.

No

rm

e N

FP

A N

° 9

6 s

ur 

la

 d

isp

ers

io

n

des

 va

peu

rs 

pro

ven

ant

 de

s a

ppa

rei

ls 

de

cui

sso

n, 

der

niè

re 

édi

tio

n, 

don

t o

n p

eut

se 

pro

cur

er 

un 

exe

mpl

aire

 au

prè

s d

e la

Na

tio

na

l F

ire

 P

ro

te

cti

on

 A

sso

cia

tio

n,

Bat

ter

ym

arc

h P

ark

, Q

uin

cy,

 M

A 0

226

9.

4.

Dan

s l’

Éta

t d

u M

ass

ach

use

tts

, to

us 

les

app

are

ils

 au

 ga

z v

ent

ilé

s à

 l’a

ide

 d’

une

ho

tte

 d

e v

en

tila

tio

n o

u d

’u

n s

yst

èm

e

d’é

cha

ppe

men

t m

uni

 d’

un 

reg

ist

re 

d’a

ir o

u

de 

moy

ens

  d

’éc

hap

pem

ent

 de

 la

 pu

iss

anc

e

doi

ven

t s

atis

fai

re 

à la

 no

rm

e C

MR

 24

8.

Au 

Can

ada

 :

1.

Cod

es 

loc

aux

.

2.

Nor

me C

AN/

CSA

-B1

49.1

 du

 Co

de d

’ins

tall

atio

n

des

 ap

par

eils

 fo

nct

ion

nan

t a

u g

az 

nat

ure

l

(de

rni

ère

 éd

itio

n).

3. N

orm

e C

AN

/C

SA

-B

149

.2 

du 

Cod

e

d’in

sta

lla

tio

n d

es 

app

are

ils

 fo

nct

ion

nan

t

au 

gaz

 pr

opa

ne 

(de

rni

ère

 éd

itio

n),

 do

nt

on 

peu

t s

e p

roc

ure

r u

n e

xem

pla

ire

 au

prè

s

de 

la 

Can

adi

an 

Gas

 As

soc

iat

ion

, 1

78

Rex

dal

e B

lvd

., E

tob

ico

ke,

 O

nta

rio

, C

ana

da

M9w

 1R

3.

Con

str

uct

ion

Con

str

uct

ion

com

bus

tib

le

inc

om

bus

tib

le

Côt

és

Arr

ièr

e

Côt

és

Arr

ièr

e

152

 m

m(6

 po

)1

52 

mm

(6 

po)

Auc

un

Auc

un

Summary of Contents for ML-136590

Page 1: ...CANHART COM INSTALLATION OPERATION MANUAL For additional information on Vulcan Hart or to locate an authorized parts and service provider in your area visit our website at www vulcanhart com CHOP HOUS...

Page 2: ...PERATE THIS DEVICE IMPORTANT IN THE EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE...

Page 3: ...ED BROILERS 6 BURNERS RADIANTS 6 VENTILATION HOOD 7 GAS CONNECTION 7 GAS PRESSURE REGULATOR INSTALLATION 7 OPERATION 8 CONTROLS 8 LIGHTING THE GAS PILOT 8 TEMPORARY SHUTDOWN 8 COMPLETE SHUTDOWN 8 PREH...

Page 4: ...vice and proper operation INTRODUCTION Combustible Non Combustible Construction Construction Sides Rear Sides Rear 6 inches 6 inches 0 inches 0 inches INSTALLATION CODES AND STANDARDS The broiler must...

Page 5: ...sters rear Figure 2 4 Install the two 2 front locking casters into the short end of the leg assembly Fig 2 5 Install the rear non locking casters into the remaining two 2 leg assemblies Tighten nut Fi...

Page 6: ...he broiler without depending on the connector and the quick disconnect device or its associated piping to limit broiler movement Attach the restraining device at the rear of the broiler If disconnecti...

Page 7: ...he regulator is positioned with the vent plug and adjustment screw upright Fig 8 Figure 7 Figure 8 CAUTION All gas supply connections and any pipe joint compound must be resistant to the action of pro...

Page 8: ...ff Make sure all individual burner valves are off before relighting WARNING THE BROILER AND ITS PARTS ARE HOT USE CARE WHEN OPERATING CLEANING OR SERVICING THE BROILER CONTROLS Access hole to pilot ad...

Page 9: ...ld be corrected by increasing the air shutter opening Figure 11 Grate and Carriage Adjustment If carriage tension is too strong turn adjusting nuts counterclockwise If one side of the grate is lower t...

Page 10: ...tainless steel Treated water from softeners or certain filters can eliminate these mineral deposits Otherdepositsfromfoodorlubrication must be properly removed by cleaning Use milddetergentandnon chlo...

Page 11: ...e exhaust hood venting system should be examined and cleaned SERVICE AND PARTS INFORMATION To obtain service and parts information concerning this model contact Vulcan Hart or refer to our website www...

Page 12: ...12 F 35684 5 07 PRINTED IN U S A...

Page 13: ...12 GRILLOIRS AU GAZ F 35684 5 07 IMPRIM AUX TATS UNIS...

Page 14: ...t d vacuation SERVICE DE L ENTRETIEN ET PI CES DE RECHANGE Pour l entretien de cet appareil ou pour obtenir des renseignements sur les pi ces de rechange communiquer avec le service de l entretien Vul...

Page 15: ...sur l acier inoxydable Utiliser plut t un tampon r curer en plastique ou un chiffon doux Pour les taches tenaces toujours frotter parall lement aux lignes du poli ou dans le sens du grain Une eau dur...

Page 16: ...et du chariot Pour un meilleur fonctionnement r gler le chariot de la grille Si la tension du chariot est trop forte tourner les crous de r glage dans le sens contraire des aiguilles d une montre Si...

Page 17: ...mer nouveau burner valves are off before relighting AVERTISSEMENT LES COMPOSANTS CHAUDS PEUVENT CAUSER DES BR LURES EXERCER UNE EXTR ME PRUDENCE LORS DE L EXPLOITATION DU NETTOYAGE OU DE L ENTRETIEN D...

Page 18: ...ue possible du grilloir sur la conduite d alimentation en gaz S assurer que la fl che sur la sous face du r gulateur est orient e dans la direction de l coulement du gaz vers le br leur Fig 7 et que l...

Page 19: ...une autre il est conseill de la niveler nouveau se r f rer la section NIVELAGE NIVELAGE Le grilloir est mont sur un support muni de roulettes Placer le grilloir sur un plancher niveau BR LEURS ET BRIQ...

Page 20: ...les avant dans la petite extr mit de l assemblage de la patte Fig 2 5 Installer les roulettes non verrouillables arri re dans l assemblage de deux pattes restantes Tighten nut Figure 3 6 Fixer les qua...

Page 21: ...minimal de 610 mm 24 po est requis devant l appareil INTRODUCTION CODES D INSTALLATION ET NORMES L installation du grilloir doit tre conforme aux exigences suivantes Aux tats Unis 1 Codes locaux 2 Nor...

Page 22: ...GE 6 BR LEURS ET L MENTS RADIANTS 6 HOTTE DE VENTILATION 6 BRANCHEMENT DU GAZ 6 INSTALLATION D UN R GULATEUR DE PRESSION DE GAZ 7 EXPLOITATION 8 COMMANDES 8 ALLUMAGE DE LA VEILLEUSE AU GAZ 8 ARR T TEM...

Page 23: ...COURANT NE PAS FAIRE FONCTIONNER CET APPAREIL AVERTISSEMENT L INSTALLATION LE R GLAGE LA MODIFICATION ET L ENTRETIEN INCORRECTS DE CET APPAREIL PEUVENT CAUSER DES DOMMAGES MAT RIELS DES BLESSURES ET...

Page 24: ...MODE D INSTALLATION ET MODE D EMPLOI Pour de plus amples d tails concernant Vulcan Hart ou pour rep rer le d taillant de pi ces et de service autoris le plus pr s visiter notre site Web l adresse www...

Reviews: