FAX version 911373_00(1) Page 6 of 9
9
10
Install 2 support screws, and center
case cover.
Adjust and secure strike.
Shim for 3/16
if shimming is
necessary
299/299F Strike
Support
screws (2)
3/16
Strike plate
(299 only)
E
F
Remove protective
film from pushbar
For
98F/99F (fire rated)
devices on
wood or composite door:
#825 sex bolts
required for 2
support screws
#25 Drill
#10-24 tap
1/8 Drill
pilot 1 deep
M
etal
Wood