Model DMTC22KW
Domestic Charger AC 22kW
20
⇒
L1 –
phase
1 (brown)
⇒
N –
Neutr
al (
blue
)
⇒
L2 –
phase
2 (black)
⇒
PE – Protective earth
⇒
L3 –
phase 3 (grey
) (
yellow/green
)
→
Connect the three phases according to the color indications for the 22kW power.
For single-phase connection, connect phase 1 to the 7kW power.
→
The DMTC22KW charger is programmable at the factory with powers from 1.6kW
to 22kW. With the exception of the screen version (OCPP), this programming will
always be done by the manufacturer.
→
Check the protection between the supply and the equipment.
→
Check the earth supply.
→
Check that all screws are tight;
→
Check that the AC power cable breakers are turned off during operation;
→
Do not forget to connect the earth wires to the grounding end plate.
→
Maintenance mode: check that all power supplies have been cut off before carrying
out any maintenance work;
→
Check the wires: before closing the front door and fixing the unit, check that all
cables are properly placed inside, to ensure the best waterproof performance;
→
Check the connectors: check that the sockets are in good condition before inserting
any external connector into the unit;