
minutes
30 minutes
60 minutes
1)
If ordered for air or N
2
or O
2
and the unit is calibrated with air and all have the same operating
conditions, range and dynamics, all these 3 gasses will be programmed. The gas is set default on
the customer ordered gas.
2) The reference condition of all units under “Real and Norm” are always 0
⁰
C and 1013.25 mbara.
(Both for the totalizer and flow units). The reference conditions of all “Other Units” are always
defined at the time of ordering.
factor. For example: ln/min becomes ln, kg/h becomes kg, etc. The totalizer unit can be changed
6.20. CE Declaration of Conformity
6.21. Change history
Date
Version
Replaces
FW
Author
Note
01/06/2015 EN A1-1
PdW
Initiated new Manual
29/06/2015 EN A1-2
EN A1-1
PdW
After review Engineering
03/07/2015 EN A1-3
EN A1-2
3.0.0
PdW
After review Sales
08/07/2015 EN A1-4
EN A1-3
3.0.0
PdW
After review Management
13/07/2015 EN A1-5
EN A1-4
3.0.0
PdW
Clarified current power supply
15/07/2015 EN A1-6
EN A1-5
3.0.1
PdW
Adapted for new firmware
24/07/2015 EN A1-7
EN A1-6
3.0.1
PdW
Adapted 4.11.3 (Units), overview default setting, minor
corrections
11/02/2016 EN A1-8
EN A1-7
3.0.3
PdW
Adjusted Manual to improvements in firmware version
3.0.3
26/04/2016 EN A1-9
EN A1-8
3.0.4
PdW
Adjusted Manual to improvements in firmware version
3.0.4
EN A2-0
EN A1-9
LEU
Relais lifetime, default values. Not released
20/05/2017 EN A2-1
EN A1-9
3.0.5
PdW
Adjusted to Firmware version 3.0.5, change company AG to
GmbH
07/06/2019 EN A2-2
EN A2-1
3.0.6
PdW
Adjusted to Firmware version 3.0.6
31/10/2019 EN A2-2
EN A2-1
3.0.6
KSA
Rewritten “operation: introduction” and battery
replacement chapter
7. Index
A
Accuracy 12
alarm contacts 15, 16, 46
alarm module 7, 15, 27, 34
alarm reset 33
Alarms and notifications 27
Appendix 45
ATEX 3
B
backlight 20, 37, 38, 46
Battery 14
Battery, how to replace 21
Block diagram 11
C
Calibration 16
CE Declaration of Conformity 58
Change history 59