Installation Instructions
Piping Installation:
Use ACR refrigeration tubing and nitrogen purge during brazing to prevent formation
of copper oxide. For piping runs exceeding 25’, consult a reliable piping manual (Copeland, Heatcraft, or Vilter)
for proper pipe sizing. Heat sink all ball valves and remove Schrader valve core prior to brazing. Pressure test
piping for leaks. Evacuate lines to 500 microns prior to starting machine.
Chute Location:
Using drawing and table below, determine ice machine location so that it is centered on
bin. Place ice machine on ice storage unit and bolt in place.
Machine must be level front to back and side
to side for proper operation.
FIGURE 2-2
Ice Chute Cutout Location
Split System
Skid Mounted
27” (VT40)
39 1/2” (VT60, VT80 & VT100)
27” (VT40)
39 1/2” (VT60, VT80 & VT100)
Summary of Contents for VT100
Page 1: ...VT Series Ice Maker Model VT40 VT60 VT80 VT100 Revision Date 1 04 12 ...
Page 21: ...2 14 Vogt VT Service Manual Installation Instructions Blank ...
Page 29: ...4 6 Vogt VT Service Manual Initial Startup Blank ...
Page 51: ...7 6 Vogt VT Service Manual Troubleshooting Blank ...
Page 71: ...8 20 Vogt VT Service Manual Service Operations Blank ...