12
FACTORY BUILT CHIMNEY
When a metal prefabricated chimney is used, the manufacturer’s installation instructions must be followed.
You must also purchase (from the same manufacturer) and install the ceiling support package or wall pass-
through and “T” section package,
fi
restops (where needed), insulation shield, roof
fl
ashing, chimney cap, etc.
Maintain proper clearance to the structure as recommended by the manufacturer. The chimney must be the
required height above the roof or other obstructions for safety and proper draft operation.
Summary of Contents for VG200
Page 23: ...23 Notes ...