4
This document is property of Vogel’s Products BV
Any distribution, reproduction, copying or publication of this document is prohibited.
CEILING MOUNTING
-
In order to mount the four metal brackets shown on Fig. “
B
” above on the upper aluminium frame of
the PPL 2500, please use screws, washers and crowned nuts mentioned on “
C, D, E
” of the supplied
equipment list; put inside the groove of the aluminium frame the crowned nut as shown on Fig. 1A;
connect the ceiling bracket to the profile by the socket head screws and the crowned nuts, move the
ceiling bracket along the profile in order to position it where needed (Fig. 1B); now firmly tighten the
screws of the four brackets.
-
Note: the four ceiling mounting brackets can be mounted in two different ways on the upper
frame of the lift:
1-
Brackets mounted towards outside – Fig. 8-A – page 10
2-
Brackets mounted towards inside – Fig. 8-B – page 10
-
Once the four brackets have been mounted on the upper frame of the lift, mount the lift to the
ceiling using plugs, anchors or screws (not supplied) specific for the type of material to drill.
During the installation pay attention that the lift is perfectly levelled both on the width and on the
depth. (See Fig. 2).
Fig. 1B
Fig. 1A
Fig. 2
M
O
U
IN
_P
PL
25
00
_V
3