www.vogels.com
9531-060-Z00-01
1
3
2
4
19
18
17
16
With the 2.5mm Allen head wrench supplied, install the two
each M5 x 6mm mini adjustment Allen head screws supplied
to both sides of the “rotation” stop bar. Slowly turn the display
to the level position in each direction and adjust the two adjust
screw to set max rotation in each direction to level.
Installation Guide
Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d’Installation, Installatie gids
PFW6855
M2.5
M10
M5 x 6 mm
=14mm wrench socket
x2
The PFW6855 has a unique “load offset adjustment” feature
that allow for the heavier weight displays to be tilt corrected
past base center back to level from top to bottom. With
personal lifting gently “out “ on the bottom of the display a
9/16” (14mm) socket may be used to increase or decrease
the tilt feature of the mount.
The two side mounted screws in the receiver head of the
mount can be adjusted to add or subtract tension in the rota-
tion of the display in the mount.
Power and signal cables may be conveniently run through
the arms of the mount between the display and the power
and signal source to assist in the clean look of the cable
installed.
Note: Once cables have been installed carefully check the
movement of the mount and cables together to insure their is
no “pinching of the cables” when the mount is articulated.