v7.01 - Depósito legal y Copyright 2007. Todos los derechos reservados.
VMB ESPAÑOLA, S.A.
Operating instructions
ENGLISH
4. Operation.
4.1 -
In order to place the elevator tower in
their working location, put the tower leaned in
their transport wheels (
T
) on a hard and level
surface.
4.2 -
Get out the legs (
P
) of their support for the
transport (
S
) and insert them in their working
lodging (
V
) verifying that they are tightly
fastened by the safety catches (
R
).
4.3 -
Adjust the vertical position of the tower by
means of the disc feet supports (
Q
) rotating
the hand crank (
H
) in the necessary direction
to manage that the bubble of the spirit level (
F
)
stays centred in the circle.
4.4 -
Put the load on top of the tower using the
suitable support, in order to make work the
weight of the load only in the vertical direction.
The minimum load must be 25 Kg.
4.5 -
Lifting:
Elevate the tower rotating the hand crank
of the winch (
W
) clockwise (
N
1
), lifting the load
up to desired height.
4.6 - Lowering:
The manoeuvre of lowering is obtained
by the opposite way. Lift the blockade on the
safety catch (
M3
) and rotate the hand crank of
the winch in a counterclockwise (
N
2
) lowering
the load until that the third profile would be
completely folded.
Lift the blockade on the safety catch
(
M2
) and continue lowering the tower until that
this second profile would be completely folded.
Lift the blockade on the safety catch
(
M1
) and continue lowering the load until that
the tower would be completely folded down to
its minimum height.
The tower can be left in any intermediate
position wich would be necessary, the same
as lifting the load.
4.7 -
For the transport of the tower is necessary
to fold the tower lowering completely all the
profiles, blockading them with the safety
catches (
M1, M2, M3
). Get out the legs lifting
the blockade on the catches and put them in
their transport lodging (
S
).
Summary of Contents for TE-064PB
Page 28: ......