background image

 

 

 

Step 4

Attach two bolts (M-A or M-B) and washers (M-C) to top mounting 
holes of monitor, making sure to leave 3mm of threads exposed. 
Align bolts (M-A, M-B) in VESA plate. Secure using two more bolts (M-
A or M-B) and washers (M-C) in the bottom two holes. Tighten all four 
bolts using phillips screwdriver.

3

 

Step 5

 

Step 6

Adjust tension in monitor bracket with 6mm allen key (H) as shown 
in diagram.

Store allen keys (H, G) in cable management clip (D) for future 
adjustment.

Reviews: