background image

3

ASSEMBLY STEPS

STEP 1

Measure the required mounting height using the 

chart below.  Ensure the front edge of the mantel 

does not exceed 110°F (43°C).

STEP 2

Remove pre-installed Nuts 

(A1)

, Metal Washers 

(A2)

 and Plastic Washers 

(A3)

 from Mount 

(A) 

using Wrench 

(T-A)

.

STEP 3 

(Option A)

Wood Stud Installation

Align the bottom edge of Stencil 

(C) 

with the measured height from step 1 and mark drilling locations 

using a pencil.  Use of a stud finder and level is recommended.  Remove Stencil 

(C)

 and drill 2.2” 

(55mm) deep holes using a 3/16” (4.5mm) drill bit.  Attach Mount

 (A)

 to the wall with ST6.3x55mm 

Screws 

(W-A)

 and Washers 

(W-C) 

using a 10mm socket.

TOOLS NEEDED

3/8” Drill 

Pencil

Phillips 

Drill

3/16” Drill 

Hammer

Ruler

Stud Finder

≤ 13-3/4” (350mm) 

≤ 4” (100mm) 

≤ 7-7/8” (200mm)

≤ 11-3/4” (300mm)

 

≥ 9-7/8” (250mm) 

≥ 7-7/8” (200mm)

≥ 3-1/8” (80mm) 

≥ 11-3/4” (300mm)

T-A

10mm Socket

C

A

W-C

W-A

Summary of Contents for MOUNT-E-MM070W

Page 1: ...ollow the link for helpful videos and specifications related to this product Instruction Manual https vivo us com products mount e mm070 SKU MOUNT E MM070W help vivo us com www vivo us com 309 278 5303 Chat live with an agent GET IN TOUCH Monday Friday from 7 00am 7 00pm CST ...

Page 2: ...amage or injury caused by improper mounting incorrect assembly or inappropriate use NOTE NOT ALL HARDWARE INCLUDED WILL BE USED D x1 TV Plate E x2 VESA Bracket F x1 Front Cover G x1 Remote H x1 Power Cord T A x1 Wrench M A x4 M5x14mm Screw M B x4 M6x14mm Screw M C x4 M6x30mm Screw M D x4 M8x30mm Screw M E x4 M8x50mm Screw M F x4 Square Washer M G x8 5mm Spacer M H x8 15mm Spacer W A x6 ST6 3x55mm ...

Page 3: ...dge of Stencil C with the measured height from step 1 and mark drilling locations using a pencil Use of a stud finder and level is recommended Remove Stencil C and drill 2 2 55mm deep holes using a 3 16 4 5mm drill bit Attach Mount A to the wall with ST6 3x55mm Screws W A and Washers W C using a 10mm socket TOOLS NEEDED 3 8 Drill Pencil Phillips Drill 3 16 Drill Hammer Ruler StudFinder 13 3 4 350m...

Page 4: ... Align the bottom edge of Stencil C with the measured height from step 1 and mark drilling locations using a pencil Use of a level is recommended Remove Stencil C drill 2 4 60mm deep holes using a 3 8 10mm drill bit and insert Anchors W B into the holes Attach Mount A to the wall using ST6 3x55mm Screws W A and Washers W C and a 10mm socket A A C W B W B W C W A ...

Page 5: ...button on Remote G until the arm is fully lowered Remove and discard the plastic wedge A4 WARNING The arm is not able to fully raise and may cause damage to the mount if the wedge is not removed STEP 6 Remove the nut from each VESA Bracket E and flip open the clip 1 1 2 3 ...

Page 6: ...ve the bottom edge of the TV STEP 9 Hang the TV with VESA Brackets E onto TV Plate D Close the clips and secure using the previously removed nuts Tighten with Wrench T A STEP 8 Place previously removed Plastic Washers A3 on Mount A Attach TV Plate D to Mount A using Nuts A1 with Metal Washers A2 Make sure TV Plate D is level and tighten nuts using Wrench T A Press Front Cover F onto the front of T...

Page 7: ...anage cables using the cable clips on the arm Use Remote G to raise and lower Mount A The TV may be manually swiveled to the left and right CAUTION To avoid injury do not place hand in the arm while operating A G ...

Page 8: ...ensure you have a fully functioning product FOR MORE VIVO PRODUCTS CHECK OUT OUR WEBSITE AT www vivo us com Love your new VIVO setup and want to share Tag us in your photo vivo_us help vivo us com AVG RESPONSE TIME within office hrs 1HR 8M 23 within 15m 38 within 30m 61 within 1hr 83 within 2hr 92 within 3hr AVG RESOLUTION TIME within office hrs 15 M www vivo us com Chat live with an agent AVG RES...

Reviews: