10
1.5 E
QUIPMENT
S
UPPLIED
1.4 U
NPACKING
It is advisable that before any installation work is attempted that the system be unpacked
and the contents verified. A sizeable area approximately 3 meters square should be suitable.
Using the basic packing list attached record the items you have received. This will both help
you when you have to make an enquiry, by having the relevant details logged in your
Installation Manual, in the event of a packing omission. At this stage do not power up the
system, nor remove electronic modules from the system, as damage may occur if not handled
correctly.
EQUIPMENT SUPPLIED
QUANTITY
CHECK LIST
ViVid
1
IEC Mains Cable
1
ViVid Installation Manual
1
ViVid User Manual
1
BNC 75 Ohm Terminator
2