4
SICHERHEITSVORKEHRUNGEN
assembly Instructions
Safety Warning
1. PLEASE READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE ASSEMBLING YOUR GREENHOUSE.
2. Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profiles, glass and
polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.
3. The product you have purchased is intended
only
for the growing of plants and should
only
be used for this purpose. When used for other purposes we
will take no responsibility.
4. It is recommended that this greenhouse is assembled by two people.
5. Should you encounter difficulties constructing this house, or in fitting the glass or polycarbonate sheets, please contact your retailer
– do not use force!
6. The greenhouse must always be anchored.
011.02.1108
SIte SelectIoN
Always try to select a sunny location, sheltered
from the wind as much as possible.
ImPoRtaNt
Before assembling your new greenhouse,
please check that all parts in the provided list
are included. Please take each bundle out of
the packaging in order to identify the parts
better.
It is important that the opened bundles do not
get mixed with one another.
If something is missing please contact your
retailer.
NeceSSaRy toolS
Screw drivers (Normal and Crosshead PH2),
10mm and 17mm spanner or wrench, 10 mm
combination spanner, 1.8m Step ladder, Craft
knife, Measuring stick, Spirit level, ø 20 drill,
Accu-drill with adjustable torque.
maINteNaNce
The greenhouse should be thoroughly washed
with a gentle detergent occasionally. Please
check that the detergent used does not react
aggressively with aluminium or plastic.
Ensure that the door tracks are cleaned regu-
larly to avoid a build up of debris
0. BaSe
Important! The base must be level. A zinc-
coated steel base is available as an accessory
for all greenhouse models.
(
Attention!
Only when the greenhouse has to
be located in a very windy and unprotected
location:
Drill through both the profile at the
base of the greenhouse and the steel base,
and connect them with nuts and bolts.)
If you would rather construct your own stone
or concrete foundation, please follow the
dimensions specified in diagram 0.
Treated wooden beams at least 18mm high
and not more then 32mm wide should be posi-
tioned between the stone/concrete foundation
and the aluminium frame(A-A). On the side
where the door will be located use a treated
wooden beam not more then 52mm wide
(B-B). Connect the wooden beams to the foun-
dation with 50mm long bolts (not provided).
Foundations must extend down below the frost
level.
Diagrams in a single frame show the view
from inside the greenhouse. those enclo-
sed in a double frame show the view from
outside the greenhouse.
1. SIDe elemeNtS
Lay all of the parts on the floor and connect
them loosely. (1.1) to (1.6)
Note:
All bolt heads must slide into the bolt
channels in each vertical bar.
Repeat for the other 4 plain sides.
2. SIDe elemeNt - DooR
Lay all of the parts on the floor and connect
them loosely, (2.1) to (2.6).
3. coNNectINg the SIDe elemeNtS
Bolt the six side elements together using
corner plates (1092), (3.1) to (3.3).
Carefully insert the plastic eave ends (6067)
into the eaves at each corner, (3.4) to (3.6).
Now position your frame on the prepared base
/ foundation and connect loosely. (Please only
tighten these bolts after the building is glazed.)
Adjust the frame until it is square and vertical
and tighten the bolts connecting the sides.
Please do not over tighten.
4a. Roof
Lay all roof bars (6087) on the ground and
accurately mark them with a pencil as shown,
(4.1). These marks are important to ensure the
glazing panes fit later.
Connect the assembly help disc (6098) to the
hexagonal cone (6095) using bolt (3001) and
nut (3002) (4.2).
Assemble roof bars (6087) onto cone (6095)
(4.3) (4.4).
Note:
the straight cut edge of (6087) should
touch disc (6098) (4.3).
Tighten all bolts.
Connect ring beam (6097) with the joining
point edge on the mark (1055 mm) (4.5) (4.6).
4B. Roof
Two people should now lift the assembly onto
the roof.
Connect roof bars (6087) onto each corner
(4.7).
Using the step ladder connect roof middle bars
(6088) to hexagonal cone (6095) (4.8), ring
beam (6097) (4.9) and eave angle (6072) /
(6073) (4.10). Tighten all bolts.
Assemble the outer cone (6036) with bolt
(6052), washer (6061), spacer (1010) and nut
(3002) and lift into place.
Note:
bolt (3001) and nut (3002) connecting
disc (6098) must be removed at this point.
Inside connect bolt extension (6038) to bolt
(6052) and then connect cover (6099) to
(6038) using washer (6061) and bolt (6059)
(4.11).
5l & R. DooRS
Lay vertical door bars (6023) / (6085) on the
ground and prepare 6 bolts (3001) in the bolt
channels in each.
Press the glazing seals (1020) onto (6023) /
(6085) (5.1) and cut to length.
Connect (6014) to bars (6023) / (6085) using
the prepared end bolts and washers (6060)
(5.2).
Position the top glass pane (A) and then
middle bar (6015) or (6016) onto (6023) /
(6085) (5.3).
Finally position the lower glass pane (B) and
connect (6017) using the last two prepared
bolts (5.4).
Fix the glass on both sides with the plastic
fixing strips (6031) (5.5).
Summary of Contents for Hera 2 9000
Page 23: ......