5
square and tighten all bolts.
Please do not over tighten. (max. 3Nm)
Connect the door runner support (1357) to the
door runner bar (1347) (4.8) and to the gable
end using bolt (4201) and spacer (1310) (4.9).
Press the end protectors (1017) and (1018)
onto the profile ends (4.10).
5. DooR
attention: Do not stand the assembled
door on the door gliders (1014) to avoid
damaging them.
Push the door gliders (1014) onto both ends of
door bar (1360) (5.1).
Assemble the door as shown in diagram 5.
Bolt door bar (1362) to upper bar (1359) (5.3)
and slide door seals (3021) into the both side
bars (1350) (5.5). Slide bolts (1500) into the
bottom of the bolt channel holding brush seals
(3021) and fix it in place using nut (1515) (5.6).
Cut the door seals (3021) to length.
Connect door rollers (1015) to the door bar
(1362) using bolt (1304), washer (1009) and
nut (1007) (5.4).
Now slide the door rollers into the door runner
bar (1347) (5.7). Please ensure that the door
gliders are also running on the bottom track
(5.8). Once the door is correctly in place, con-
nect a nut and bolt into the end of door runner
bar (1347) as door stopper.
Adjust the door so that it moves freely.
6. RooF VeNtS
Connect the side bars (1065) and the top bar
(1064) depending on the pane thickness.
Up to 4 mm, see (6.1). For 4 mm and over,
see (6.2).
Place the bolts to connect the bottom bar
(1066) in the prepared holes, and then slide
the glass into the tracks in side bars (1065)
(6.3).
Now connect bottom bar (1066), and ensure
that the window is totally square before
tighten ing all bolts.
Position the window in the ridge bar from one
end (6.4) and (6.5) and slide it to the required
position (6.6).
Connect the window sill (1063) with the extra
bolts in the roof glazing bars (6.7). If the
window is connected in a corner position, then
it is necessary to use bolt (2001), instead of
(1001), on the corner bar.
Connect the window opener (1067) to the bot-
tom bar (1066) (6.7) using screws (1006) (6.8).
Place the plastic cap (1019) over the end of
the window opener (6.6) and connect both
window fixers (1016) onto the window sill
(1063) using screws (1006) (6.8).
7. GlazING – cleaR GlaSS
Please note the already mentioned safety
precautions.
Press the glazing seals (1020) onto the alumi-
nium profiles (7.3) and cut to length.
On the roof begin by positioning the glass at
the eave and fix in place using the glazing
spring clips (1011) (7.2). The following pane
should be placed over the pane directly under
it and held in place with the glass retaining
clips (1012) between the panes (7.1).
On the sides please begin from the bottom.
If you’ve chosen polycarbonate sheets instead
of glass panes, please use the instruction in-
cluded in the box with the polycarbonate
sheets.
FINIShING
Fill the holes for the anchor legs with concrete.
The steel base should be connected to the
foundation using screws and plugs (not provi-
ded).
If desired, it is possible to seal the greenhouse
at the edges using neutral silicone. Silicone is
not in cluded.
Place the warning label inside the house.
A full range of accessories is available to help
you make the most of this product. Please
contact your local stockist for details.
SaFety NotIce
In the event of high winds, close all doors and
vents.
In the event of heavy snowfall, clear the roof
of the building or take suitable measures to
support the roof. Heat the building in winter.
commeNtS
For the complete protection of your new
greenhouse, we advise you to include it in
your house insurance. Please take note of
possible building rules relating to the position-
ing of greenhouses.
Please stick the greenhouse model label pro-
vided onto the door bar (1362) after success-
fully assembling this product. This information
is important in the event that replacement
parts are later required.
Please keep these Assembly Instructions in
a safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the specifi
-
cations without prior notice.
061.01.1703