Air Handler
14
8.2 Special Instructions
This air handler comes with a plastic accessory bag which contains: tailpiece and white teflon
seal.
WARNING
THE COIL IS SHIPPED UNDER PRESSURE. RELEASE THE PRESSURE BEFORE
INSTALLATION.
Evaporator Throttling Device
1.Remove 9/16 nut, then press the Schrader valve to release pressure, no gas indicates a
possible leak.
2.After the gas has released, remove the 13/16 nut, Schrader valve and white teflon seal from
the liquid line distributor.
3.Remove cap closure from suction line .
4.Take the tailpiece from the plastic accessory bag and slide the 13/16 nut into place.
5.Braze tailpiece to the line set liquid tube.
6.Insert the suction line into the connection, slide the rubber grommet at least 18’’away from the
braze joint. Braze suction line.
7.After the tailpiece has been cooled, confirm the position of white teflon seal and tighten the
13/16 nut manually.
8.Torque the 13/16nut to 20-30 ft-lbs.
9.Replace suction line grommet.
13/16"Nut
Tailpiece
White teflon seal
Flowrator
Figure 5