background image

LADDER (8ft / 2.5m)

RUBBER MALLET

POWER DRILL

TAPE MEASURE

PENCIL

IMPORTANT

0093_Milano_11x11_Instructions_V1.2

MILANO

CODE: 0093

TOLL FREE: 1-877-795-7423

TWO PERSON PROJECT

PRODUCT CAN BE HEAVY

USE CARE WHEN LIFTING

SITE PREPARATION

ASSEMBLE THE STRUCTURE ON A FIRM, LEVEL SURFACE.

PROTECT THE PRODUCT FROM DAMAGE AS SOME PIECES MAY BE FRAGILE.

ESTIMATED ASSEMBLY TIME: 4 HOURS

IF YOU REQUIRE ASSISTANCE, OR NEED TO ORDER REPLACEMENT PARTS,

CONTACT YOUR VISSCHER DEALER.

FOR ADDITIONAL INFORMATION PLEASE CALL THE NUMBER BELOW.
PLEASE HAVE SERIAL NUMBER READY TO ENSURE QUICK SERVICE.

BEFORE YOU BEGIN

THESE INSTRUCTIONS MUST BE FOLLOWED STEP BY STEP. DEVIATION FROM THE

INSTRUCTIONS MAY VOID THE PRODUCT'S WARRANTY.  SEE WARRANTY SHEET
FOR FURTHER DETAILS.

READ ALL INSTRUCTIONS THOROUGHLY BEFORE STARTING ASSEMBLY.

USE THE PARTS LIST AS A CHECKLIST FOR COMPONENTS.

UNWRAP PARTS ONLY AS NEEDED TO KEEP COMPONENT DEALER CODE LABEL
INTACT FOR REFERENCE.

TOOLS NEEDED

EN

Summary of Contents for MILANO

Page 1: ...9 4 15 16 6 9 11 03 4 12 0 12 0 12 0 11 0 3 4 INSTRUCTIONS 0093_Milano_11x11_Instructions_V1 2 MILANO CODE 0093 TOLL FREE 1 877 795 7423 Front Elevation Plan View Footprint EN ...

Page 2: ......

Page 3: ...YOU REQUIRE ASSISTANCE OR NEED TO ORDER REPLACEMENT PARTS CONTACT YOUR VISSCHER DEALER FOR ADDITIONAL INFORMATION PLEASE CALL THE NUMBER BELOW PLEASE HAVE SERIAL NUMBER READY TO ENSURE QUICK SERVICE BEFORE YOU BEGIN THESE INSTRUCTIONS MUST BE FOLLOWED STEP BY STEP DEVIATION FROM THE INSTRUCTIONS MAY VOID THE PRODUCT S WARRANTY SEE WARRANTY SHEET FOR FURTHER DETAILS READ ALL INSTRUCTIONS THOROUGHLY...

Page 4: ......

Page 5: ...36 387 8 4X 1681 377 16 2X 2030 8 1842 1X 43 4X 4X 4X 4X 58 58 42 42 1855 1853 1854 1856 4X 188X 4X SOLID SOLIDE SCREEN MOUSTIQUAIRE 4X 1643 1642 1640 1641 L G R D 0093_Milano_11x11_Instructions_V1 2 MILANO CODE 0093 PAGE OF DE TOLL FREE 1 877 795 7423 MEASUREMENTS ARE APPROXIMATE MESURES SONT APPROXIMATIVES TRUSS FRAME FERME DE TOIT DRAPES RIDEAUX ROOFING TOITURE EN ...

Page 6: ......

Page 7: ...ons_V1 2 MILANO CODE 0093 TOLL FREE 1 877 795 7423 A 1 1 2 8 FLAT HEAD 2 ROBERTSON 55X 1 1 2 PO TETE PLATE NO 8 no 2 ROBERTSON B 2 1 2 8 FLAT HEAD 2 ROBERTSON 170X 2 1 2 PO TETE PLATE NO 8 no 2 ROBERTSON L 2 1 2 SCREW 8 HEX HEAD 1 4 DRIVER 5X M 3 SCREW 8 HEX HEAD 1 4 DRIVER 32X 1 1 2 ROOFING SCREWS J 16X WITH POLYZIP WASHER 16 VIS DE 1 1 2 PO POUR TOITURE REQUISES AVEC RONDELLES POLYZIP I 1 10 MET...

Page 8: ......

Page 9: ...E 1305 PIECES TOGETHER AS SHOWN ATTACH THE PIECES USING THREE 2 1 2 ROBERTSON SCREWS AS EACH JOINT AS SHOWN 2 1 2 ROBERTSON SCREWS 12 req DC 1305 DC 1305 DC 1305 DC 1305 NOTE IT IS VERY IMPORTANT TO CHASE FOLLOW CORNERS AS SHOWN IN DIAGRAMS 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 EN B ...

Page 10: ...RUSS FRAME THE TRUSS FRAME ASSEMBLY MUST REMAIN SQUARE DOUBLE CHECK CORNER TO CORNER MEASUREMENTS ONCE BRACES ARE ATTACHED LAY THE SQUARED TRUSS FRAME ASSEMBLY AT THE EXACT LOCATION YOU WISH YOUR GAZEBO TO BE USING A PENCIL OR MARKER TRACE THE OUTSIDE EDGES OF ALL FOUR CORNERS ONTO THE GROUND THESE MARKINGS WILL BE HELPFUL IN PLACING YOUR CORNER POSTS AND PANELS IN THE STEPS TO COME ONCE MARKINGS ...

Page 11: ... THE TRUSS FRAME AS DESCRIBED IN THE CORNER DETAIL DRAWING CORNER DETAIL ATTACH THE POSTS TO THE CORNER OF THE TRUSS FRAME WITH FOUR 2 1 2 ROBERTSON SCREWS THROUGH THE INSIDE INTO THE TRUSS FRAME AS SHOWN IN CORNER DETAIL Vista Leisure 11 x 11 Open Air Step Three MILANO 2 1 2 ROBERTSON SCREWS 24 req D C 1 0 4 1 D C 1075 D C 1075 D C 1 0 4 1 DC 1305 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 8...

Page 12: ...OWN AND ATTACH TO THE TRUSS FRAME AS DESCRIBED IN THE CORNER DETAIL DRAWING CORNER DETAIL ATTACH THE POSTS TO THE CORNER OF THE TRUSS FRAME WITH TWO 2 1 2 ROBERTSON SCREWS THROUGH THE INSIDE SUPPORT INTO THE TRUSS FRAME AS SHOWN IN CORNER DETAIL Vista Leisure 11 x 11 Open Air Step Four MILANO 2 1 2 ROBERTSON SCREWS 8 req D C 1 0 4 1 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 B EN...

Page 13: ...CKETS TIGHT INTO THE CORNERS ADJUST THE BOTTOM OF THE POSTS SO THAT THE BRACKETS ARE TIGHT ON BOTH EDGES ATTACH EACH BRACKET TO THE POST AND THE TRUSS FRAME AS SHOWN WITH FOUR 2 1 2 ROBERTSON SCREWS 2 1 2 ROBERTSON SCREWS 16 req D C 1075 D C 1075 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 B EN ...

Page 14: ...ANO BUILD THE SKYLIGHT FRAME USING THREE 2 1 2 SCREWS ON EACH CORNER IT IS IMPORTANT TO CHASE CORNERS AS SHOWN BELOW DC 1681 DC 1681 DC 1681 DC 1681 2 1 2 ROBERTSON SCREWS 12 req 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 B EN ...

Page 15: ...ENTRE OF EACH SIDE BOTTOM OF RAFTER FLUSH WITH BOTTOM OF SKYLIGHT FRAME SEE SECTION VIEW USE TWO 3 9cm HEX SCREWS THROUGH THE SKYLIGHT FRAME INTO COMMON RAFTERS AS SHOWN INTO EACH RAFTER 3 HEX HEAD SCREWS 8 req DC 1675 DC 1675 DC 1675 DC 1675 DC 1675 DC 1675 FLUSH FLUSH SECTION VIEW 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 M EN ...

Page 16: ... FRAME AND RAFTER ASSEMBLY OVER AND PLACE ON TRUSS FRAME AS SHOWN IN SECTION DETAIL PLACE RAFTERS CENTERED ON THE TRUSS FRAME DO NOT SCREW RAFTERS TO THE TRUSS FRAME AT THIS TIME SECTION VIEW TOP PLAN VIEW 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 EN ...

Page 17: ...LER CODE 1676 IN PLACE AS SHOWN IN SECTION DETAIL AND TOP VIEW PLACE WITH OUTSIDE BOTTOM POINTS OF THE RAFTER FLUSH WITH THE BOTTOM OF THE SKYLIGHT FRAME ATTACH EACH HIP RAFTER WITH TWO 3 8cm HEX SCREWS FROM THE INSIDE OF THE SKYLIGHT FRAME INTO THE TOP END OF THE HIP RAFTER AS SHOWN D C 1 6 7 6 D C 1 6 7 6 D C 1 6 7 6 D C 1 6 7 6 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 M EN ...

Page 18: ...GLE AT THE FRONT IS LINED UP FLUSH WITH THE TOP OF ALL THE RAFTERS ATTACH EACH OF THE EIGHT PANEL SUPPORTS WITH FOUR 2 1 2 SCREWS DOWN INTO THE TOP OF THE TRUSS FRAME AS SHOWN dc 1325 dc 1324 2 1 2 ROBERTSON SCREWS 32 req FLUSH dc 1324 dc 1324 dc 1324 dc 1325 dc 1325 dc 1325 dc 1324 dc 1325 SECTION VIEW FLUSH 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 B EN ...

Page 19: ...E THE PIECES CENTRED ON THE RAFTERS ATTACH THEM WITH SIX 2 1 2 SCREWS DOWN THOUGH THE STRAPPING INTO THE RAFTERS AS SHOWN REPEAT THIS FOR THE MID STRAPPING DC 1244 MAKE SURE THAT THE COMPOUND ANGLE CUTS ARE FACE DOWN MAKING A TIGHT JOINT AT THE CORNERS REPEAT THIS STEP FOR ALL FOUR SIDES OF THE ROOF DC 1758 DC 1758 DC 1758 DC 1758 DC 1244 DC 1244 DC 1244 DC 1244 DO NOT STAND ON THE TRUSS FRAME OR ...

Page 20: ... FOUR SIDES SECURE THE COMMON RAFTERS ON EACH SIDE WITH TWO 3 HEX HEAD SCREWS AS SHOWN IN DETAIL 1 BELOW DETAIL 1 DETAIL 2 USE 3 SCREWS TO SECURE THE BOTTOM OF THE HIP RAFTERS DETAIL 2 PLACE THE SCREWS THROUGH THE CORNER OF THE TRUSS FRAME INTO THE END OF THE RAFTER USE TWO SCREWS AT EACH CORNER 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 M EN ...

Page 21: ...TABS ON THE UNDERSIDE OF THE ROOFING BEHIND THE FIRST ROW OF DRILLED SCREW HOLES AS SHOWN IN THE ROOF EDGE SECTION CUT OFF ENDS OF CLOSURE TAB AS NECESSARY SECTION VIEW CLOSURE TABS DEALER CODE 1834 CLOSURE TABS DEALER CODE 1834 ROOFING SHEET 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 EN ...

Page 22: ...ACH THE METAL ROOF SHEETS TO THE STRAPPING WITH 1 HEX HEAD ROOFING SCREWS PLACE A SCREW THROUGH EACH THE PRE DRILLED HOLES IN THE ROOFING SHEETS DO THIS STEP ON THREE SIDES OF THE ROOF 1 ROOF SCREWS 120 req PLACE THE METAL SHEETS TIGHT TO THE OUTSIDE EDGE OF SKYLIGHT FRAME NOT ON TOP OF THE FRAME TIP PLACE THE ROOFING ON ONLY THREE SIDES OF THE ROOF THEN MOVE ON TO THE NEXT STEP THIS WILL MAKE IT ...

Page 23: ...fteen MILANO ASSEMBLE THE SKYLIGHT ASSEMBLY USING THE DEALER CODES SHOWN BELOW ATTACH EACH END OF THE 1841 TO 1840 USING ONE 2 1 2 HEX HEAD SCREWS 2 1 2 HEX HEAD SCREWS 4 req 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 L EN ...

Page 24: ... 11 Open Air Step Sixteen MILANO UNROLL THE FOAM WEATHER STRIP AND PLACE ON THE INSIDE EDGE ALONG THE PERIMETER OF THE SKYLIGHT FRAME DC 1850 TRIM AS NEEDED 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 EN ...

Page 25: ...OF THE SKYLIGHT FRAME ONCE THE ACRYLIC IS IN PLACE SCREW THROUGH THE PRE DRILLED HOLES USING 1 1 2 ROOF SCREWS WITH POLYZIP WASHERS AS SHOWN DC 1842 1 1 2 ROOFING SCREWS WITH POLYZIP WASHERS 2 req IT IS IMPORTANT THAT THE SCREWS ARE CENTRED IN ACRYLIC HOLES THIS IS TO PREVENT CRACKING OF THE ACRYLIC CAUSED BY EXPANSION AND CONTRACTION 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 J ...

Page 26: ...RE DRILLED HOLES INTO THE SKYLIGHT FRAME 1 1 2 ROOFING SCREWS WITH POLYZIP WASHER 14 req IT IS IMPORTANT THAT THE SCREWS ARE CENTRED IN ACRYLIC HOLES THIS IS TO PREVENT CRACKING OF THE ACRYLIC CAUSED BY EXPANSION AND CONTRACTION 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 J EN ...

Page 27: ...UP ONTO THE ROOF THEN CAREFULLY PLACE IT DOWN INTO POSITION ON TOP OF THE SKYLIGHT FRAME FASTEN THE SKYLIGHT FRAME TO THE THE 2x6 FRAME ATTACH WITH THREE SCREWS ON ANGLE INTO EACH SIDE OF THE SKYLIGHT FRAME AS SHOWN ON SECTION VIEW SECTION VIEW 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 A EN ...

Page 28: ...NTRE SHEETS TIGHT TO THE SKYLIGHT BOX MAKE SURE YOU HAVE ALL FOUR PIECES IN PLACE WITH AND EQUAL OVERHANG OVER THE THE WHOLE EDGE OF THE EAVE BOTTOM STRAPPING PIECE ATTACH THE METAL ROOF SHEETS TO THE STRAPPING WITH 1 HEX HEAD ROOFING SCREWS PLACE A SCREW THROUGH EACH THE PRE DRILLED HOLES IN THE ROOFING SHEETS NOTE FASTEN ALL ROOFING SCREWS PRIOR TO STEPPING ON ROOF 0093_Milano_11x11_Instructions...

Page 29: ...Step Twenty One MILANO CAREFULLY PEEL THE BACKER AND PLACE THE SEALING TAPE DC 2033 UNDER THE SKYLIGHT FRAME FLASHING AS SHOWN IN DETAIL 1 SEALING TAPE DC 2033 0093_Milano_11x11_Instructions_V1 2 EN ...

Page 30: ... DC 2033 OVER TOP OF THE JOINT BETWEEN THE ROOFING SHEETS APPLY PRESSURE TO ADHERE THE TAPE TO THE CONTOUR OF THE ROOFING SHEETS ONCE ADHERED FULLY TRIM AT EDGE OF THE ROOFING SHEET AS SHOWN IN DETAIL 1 REPEAT THIS ON ALL FOUR SIDES DETAIL 1 THE SEALING TAPE MUST BE CENTERED ON THE JOINT CENTRED ON JOINT EN ...

Page 31: ...THE CAP IS SITTING CENTRED ON THE HIP THEN ATTACH IT THROUGH THE ROOFING SHEET AND INTO THE STRAPPING SCREWS MUST BE FASTENED THROUGH THE TOP RIBS OF THE ROOFING SHEET ONLY DO NOT OVER TIGHTEN OR THE HIP CAPS MAY BE DAMAGED DC 1179 DC 1179 DC 1179 DC 1179 DC 1179 SCREWS MUST BE FASTENED THROUGH THE TOP RIBS OF THE ROOFING SHEET ONLY 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 1 RO...

Page 32: ... THE RAIL ON THE TRUSS FRAME CENTRE THE RAIL SO THERE IS AN EVEN SPACE AT EITHER END BETWEEN THE THE CURTAIN RAIL AND THE ADJACENT TRUSS FRAME ATTACH THE RAIL TO THE INSIDE OF THE TRUSS FRAME AS SHOWN IN DETAIL 1 AND DETAIL 2 DETAIL 2 1 1 2 ROBERTSON SCREWS 40 req DETAIL 1 DC 1641 DC 1641 SECURE RAILS TOGETHER SECTION VIEW 0093_Milano_11x11_Instructions_V1 2 TOLL FREE 1 877 795 7423 A DC 2030 SPAC...

Page 33: ...D DRAPE IS MEANT TO HANG ON THE OUTER HOOKS AND THE SCREEN DRAPE IS MEANT TO HANG OF THE INNER HOOKS FIND THE CENTRE OF EACH OF THE DRAPE CURTAINS AND POSITION AT THE CORNER POSTS OF THE STRUCTURE SLIDE THE HOOKS INTO THE EYELETS AT THE TOP OF THE CURTAINS ONE SIDE OF THE CURTAIN WILL COVER HALF OF ONE SIDE OF THE STRUCTURE DETAIL 1 MIDDLE OF CURTAIN ZIPPER MIDDLE OF CURTAIN MIDDLE OF CURTAIN ZIPP...

Page 34: ......

Reviews: