12
The installation of Andromeda Hydro Mover bed has to be executed by quali
fi
ed
personnel only.
Before proceeding with the connection to the power system please verify that it is
protected by an RCD (0,03) and that the grounding system complies with the speci
fi
c
country’s regulations on the matter.
The bed has to be
fi
xedly connected to the power supply (with a H05 - 3x2,5 mm
tripolar cable with a section of 2,5 mmq) in compliance with the product voltage and
far from electrical zones 0,1,2,3 and from any water spurts.
CONTROL PANEL FUNCTIONS
Press the setpoint button (A) for about half a second in order to view the current
setpoint temperature.
Keep the setpoint button (A) pressed while increasing or decreasing the temperature
with buttons (B) and (C) to reach the desired value.
Release the setpoint button (A) in order to memorize the chosen setting.
Keep the standby button (D) pressed for 3 seconds in order to turn on and o
ff
the
device.