Installation checklist
CHECK 1
Pre-power up checkups
Mounted onto construction designed for the game.
Make sure that all cables are connected:
DisplayPort cable from computing device to screen
Ethernet cable with internet connection to socket labeled “Internet”
If dual system, ethernet cable from one side to the other labeled “local”
Screen power cable to electricity
Computing devices power to electricity
All fixings are tight and secure.
No signs of damage, component failure and/or missing parts.
No trapped and/or pinched cables.
No loose cables that could become a tripping hazard.
Make sure there is no strain on the cables and the connectors.
All electrical components are away from contact with water and heat sources.
CHECK 2
Power up
Monitor and computing device must power on by itself when connected to power.
It usually takes around 1 min for the system to boot up. You will be presented with the
game choosing screen when done.
At this time the game is set for the first test.
CHECK 3
Start a game
Position yourself in front of the screen, move from left to right to choose the game and
jump to start a game.
CHECK 4
Ready for use
Play area is clear.
www.visiorgames.com
7