PREMIUM DSP 40-80 KVA PF0.9 3/3 - UPS www.visionups.com
13
3. Connect the output of the UPS to the load distribution panel.
4. Connect the battery groups. Refer to battery installation section.
WARNING:
-
CHECK BOTH OF THE BATTERY GROUPS FOR CORRECT POLARITY AND VOLTAGE
-
DO NOT TURN ON THE BATTERY SWITCH (F5) BEFORE STARTING THE UPS
5. Connect the copper earth bus, to the safety earth of the mains distribution panel.
NOTE:
The earth and the neutral connections must be in accordance with the local rules.
WARNING: Note that the Input Neutral (N1) MUST also be connected to K10 terminal
2.6.1 Description of connection terminals of the UPS:
Figure 2.2
a
40 - 60 kVA Cable Connection
Figure 2.2
a
80 kVA Cable Connection