R2100
Final Assembly
Step 7 • Console
1:
Insert Upper Magnet Shift Cable (220) into the top
of the Console mast (101).
2:
Mount the Console (153) to the Console Mast (101)
using the six Console Attachment Bolts (197).
Make sure you DO NOT PINCH the Upper Magnet
Shift Cable (220) and RPM Sensor Wire (64)
between the Console (153) and Console Mast (101).
3:
Plug the RPM Sensor Wire (64) into the receptacle
located on the back of the Console (153). Make
sure the RPM Sensor Wire fits in the slot cut in the
left side of the Console Mast (101).
Step 8 • Cable Connection
1:
Turn the Tension Knob to position 8. Reach inside
the opening of the Console Mast (101) and connect
the Upper Magnet Shift Cable (220) to the
rectangular red cable-slide on the end of the
Lower Magnet Shift Cable (66), as shown in the
accompanying illustrations.
2:
While holding the metal separating tab (5), turn the
Tension Knob to Level 1 and then pull the tab out
and discard.
3:
Press the Console Mast Cover (225) into the
opening of the Console Mast (101).
Step 9 • Operation Test
Run this simple test prior to using.
1:
Choose Intervals program, Level 8.
2:
Choose Time of “00:00”, and press Start.
3:
Your machine will now operate indefinitely. After
several hours of operation, check for proper
functioning of:
A: Resistance Change -- change load one
level at a time using the dial knob on
console. Pedal to feel for load change.
B: Check for display in RPMs while pedaling.
C: Check that all LCDs are working.