![Vision Aqua Verdanium Home Instructions Manual Download Page 26](http://html1.mh-extra.com/html/vision-aqua/verdanium-home/verdanium-home_instructions-manual_1031714026.webp)
Instruction Manual – Verdanium Home
– Ver. 2.2.1 – 04.2021
Instruction Manual – Verdanium Home
– Ver. 2.2.1 – 04.2021
50
51
Electrical connection
The Verdanium Home is equipped with an IEC socket, which has an integrated fuse and a power switch.
A Power cord with a length of approx. 1.8 m is supplied with the Verdanium Home.
Only connect the Verdanium Home to an electrical system complying with VEM
0100 standard.
The electrical plug must always be easily accessible to unplug the Verdanium Home from
the electrical grid.
The unit label on the upper rear part of the housing provides information about the nominal power input
and the corresponding fuse.
The information provided on the label must be compatible with the electrical grid.
•
Connect the Verdanium Home with the supplied power cable to the electrical grid.
•
When the power switch ( I ) is turned on, the Verdanium Home starts and waits for the initial
commissioning to begin.
Sample installation
1. Verdanium Home
2. Hydro-Stopper mounted to the angle valve
3. Angle valve cold water connection
4. 3/8“ tube water supply
5. 1/4“ tube wastewater
6. 1/4“ tube ultra-pure water
7. Withdrawal tap
1.
3.
4.
2.
5.
6.
7.
The maximum cable length for a 1/4“ tube is 6 m.
The maximum cable length for a 3/8“ tube is 8 m.