SLF-100-R625-P-24V
Commissioning
6 COMMISSIONING
NOTICE
Installation and connection operations may only be performed in the off and
de-energised state.
6.1 Unpacking
1. Lift the cardboard, together with the device, out of the carton.
2. Fold out the tucked in sides on the bottom of the cardboard. The film
loosens and forms an insertion pocket.
3. Remove the device out of the insertion pocket.
4. Dispose the packing material.
6.2 Mounting the Device
The following bores can be used for assembly.
1
1
2
1
1
1
1
1
1
2
Image 4: Mounting holes
1
6 x M3x0,5 tapped hole
maximum screwed-in depth: 4.5 mm
2
2 x Ø4.2 mounting hole (through bore)
18
999.995.402.10-en-1.3
© Vision & Control GmbH 2021