Visidec VFS-DV Installation Instructions Download Page 1

Component Checklist

Hardware

 

 

 

Check you have received all parts against this component checklist prior to installation. 

Cable

Ball (x4)

M8x50mm

Screw (x1)

Cable

Clip (x3)

2mm Allen

Key (x1)

5mm Allen

Key (x1) 

Mounting Screws

M4x10mm (x8)
M4x12mm (x8)
M4x16mm (x8)

  

TOOLS REQUIRED:

Phillips Head Screw Driver

Base

visidec

Upright Pole

Cable Slot

USER

BACK

TIGHTEN
FIRMLY

VESA Plate (x2)

Step 1.  Attach Upright Pole to Base

Upright Pole

M8x50mm Screw

5mm Allen Key

Security

Screw (x2)

Quickshift

Donuts (x2)

TIGHTEN

LOOSEN

If the Quickshift Donut requires further
tightening use the supplied 5mm Allen key.

Step 2.  Attach Quickshift Donuts to the Visidec Pole 

(Ensure the cable slot faces towards the rear)

(Visidec 42mm pole shown) 

Slot

Groove
Insert

Close the lever to lock the Quickshift
Donut in place.

Slide the Quickshift Donut onto the Pole.

IMPORTANT INFORMATION

 

!   Each Quickshift Donut supports Flat Panel Displays from 12” (30cm) to 24” (61cm) and supports a maximum weight of 12kg (26½lbs).
!   This product suits VESA compliant displays with 75mm x 75mm (3” x 3”) and 100mm x 100mm (4” x 4”) mounting hole patterns.
!   The manufacturer does not accept responsibility for incorrect installation.

CLOSE

Tightening Tool

Installation Instructions

Freestanding | Double Vertical

Attach the Upright Pole to the Base as shown 
below. Ensure the Cable Slot faces towards the rear. 

VFS-DV

Step 3.  Attach the VESA plate to your Display 

(Repeat Steps 3 to 6 for each Display)

Top of

Display

There are two mounting hole configurations:

UÊÇxÊÝÊÇx““
UÊ£ääÊÝÊ£ä䓓

Choose appropriate Mounting Screws
from the Hardware supplied to suit
your Display.

Mounting Screws (x4)

VESA Plate

Back of Display

75mm

(3”)

100mm

(4”)

75mm

(3”)

100mm

(4”)

Reviews: