3
Step 4.
Configurable Lighting System installation:
- Lay on the floor units and connectors in required order.
- Attach required connector (S,L,T or X) to unit M56, secure it via 2 screws and install cable grippers (2x) via 1/4-20
threaded rods (dwg 5).
- Attach required connector (S,L,T or X) to each M57 unit, secure it via 2 screws and install cable gripper via 1/4-20 threaded
rod to the connector (dwg 6).
- Install cable gripper via 1/4-20 threaded rod to unit M58 (dwg 7).
- Hang unit M56 (dwg 8) inserting AC cables through cable grippers. Adjust suspension height as required and level the unit.
- Hang the next unit and attach the loose end to previously mounted unit, secure it via 2 screws and level it. Repeat steps
until configurable lighting system installation is complete by hanging unit M58.
Step 5.
Remove fixture cover (dwg 4) and connect power to the first unit utilizing strain relief (provided) and make wiring
connections to the remaining units according to local electrical codes. Reinstall covers.
Step 6.
Connect the power.
INSTRUCTIONS (Cont’d):
ALRA-ALRB-C91
Installation Instructions
ERP: IIS00271
01/21/2020-Rev1.0
Dwg 5
M56
M57
Dwg 6
Dwg 7
‘S’
‘L’
‘T’
‘X’
‘S’
‘L’
‘T’
‘X’
M57
M56
M58
Dwg 8
M58