background image

Instructions: Low Profile Post System 

Figure A

1. IDENTIFY HARDWARE

Identify the proper hardware for installing the Low Profile 

Post System into your specific ceiling and floor materials 

(not included). For drywall, VintageView recommends 

installing to joists or wood backing when available. 

2. MEASURE HEIGHT FOR FIRST POST

Measure the ceiling height of the location of the first Post. 

Subtract ½” (13mm) from the measurement. 

3. MEASURE & MARK FIRST POST

Lay each end of the Post on the ground and overlap so 

that the measurement from the top to the bottom equals 

your measurement from Step 2 (Figure A). 

Use a Pencil or a Marker to mark the cut line. Do not 

mark or cut the end with the c-Channel.

** If the ceiling height is greater than 120” (3098mm), 

up to 122” (3099mm), the Mounting Base inserted into 

the Post Top can telescope up 2” (51mm) **

4. CUT TO FIT

Using a Metal Cutting Saw, cut the Post at the Mark (Fig-

ure B). Use a Metal File to smooth the surface of the cut. 

** Do not use Abrasive Saws as they may damage the 

finish **

5. INSERT THE MOUNTING BASES

Insert (1) Mounting Base fully into the open end of the 

Post Bottom with c-Channel. Secure the Base using (2) 

Self-Drilling Screws (Figure C). 

Insert (1) Mounting Base into an open end of a post 

top (Figure D). Do not secure with Screws until step 

10 to allow for height variations. 

Figure B

Figure C

Figure D

Reviews: