Vintage Air 1955-59 Manual Download Page 6

6

www.vintageair.com

903257 REV E 06/24/19, PG 6 OF 10

1.

 Turn on the ignition switch (Do not start the engine).

    

    

    

    

2.

 Move the control levers/knobs to the positions 

    shown.

 

    

    

    

    

3.

 Connect the white jumper wire to the gray program 

    wire. Wait for the blower speed to change (Approximately 

    5 seconds).

    

    

   

4.

 Move the control levers/knobs to the positions 

    shown.

    

    

    

5.

 Disconnect the white jumper wire from the gray 

    program wire. The blower speed will change, 

    indicating completion of the calibration procedure.

    

    

6.

 Confirm proper operation of controls. Repeat 

    procedure if necessary. When finished, tape

    over program wire connector with electrical tape to 

    prevent accidental contact with chassis ground.

Control Panel

Calibration Procedure (Cont.)

OFF

ON

START

MODE

F

A

N

C

H

MODE

F

A

N

C

H

Summary of Contents for 1955-59

Page 1: ...ny 18865 Goll St San Antonio TX 78266 Phone 800 862 6658 Sales sales vintageair com Tech Support tech vintageair com www vintageair com 903257 REV E 06 24 19 PG 1 OF 10 MODE F A N C H 1955 59 Chevrole...

Page 2: ...Contents Packing List Parts Disclaimer Control Panel Installation Control Panel Calibration Procedure Control Panel Calibration Procedure Cont Wiring Diagram Gen IV Wiring Connection Instructions Oper...

Page 3: ...231520 Description Cable Converter Assembly Control Harness Gen IV Universal Ground Wire Before beginning installation open all packages and check contents of shipment Please report any shortages dir...

Page 4: ...n Page 5 and 6 Confirm the control panel functionality as shown on Page 9 Install the control panel into the dash by placing the control panel bracket behind the dash and securing it to the control pa...

Page 5: ...d jumper wire to a suitable chassis ground This jumper wire must be easily connected to the gray programming wire located in the main Gen IV wiring harness next to the compressor relay During the cali...

Page 6: ...conds 4 Move the control levers knobs to the positions shown 5 Disconnect the white jumper wire from the gray program wire The blower speed will change indicating completion of the calibration procedu...

Page 7: ...VUR 232002 VUA CIRCUIT BREAKER 30 AMP WIDE OPEN THROTTLE SWITCH OPTIONAL DASH LAMP IF USED Dash Lamp Is Used Only With Type 232007 VUR Harness Warning Always Mount Circuit Breaker As Close to the Bat...

Page 8: ...hown Typical Compressor Wiring Be Sure Compressor Body Is Grounded Trinary Switch Connect According To Trinary Switch Wiring Diagram Install With Servo Motor Facing Down As Shown Note Flow Direction A...

Page 9: ...n between This lever knob controls the temperature from HOT to COLD Blower Speed Mode Control Temperature Control MODE F A N C H Temperature Control Temperature Control Temperature Control Mode Contro...

Page 10: ...1 No 1 2 3 Qty 1 1 1 Part No 493053 232007 VUR 231520 Description Cable Converter Assembly Control Harness Gen IV Universal Ground Wire NOTE Images may not depict actual parts and quantities Refer to...

Reviews: