![Vintage Air 1955-59 Manual Download Page 6](http://html1.mh-extra.com/html/vintage-air/1955-59/1955-59_manual_1028505006.webp)
6
www.vintageair.com
903257 REV E 06/24/19, PG 6 OF 10
1.
Turn on the ignition switch (Do not start the engine).
2.
Move the control levers/knobs to the positions
shown.
3.
Connect the white jumper wire to the gray program
wire. Wait for the blower speed to change (Approximately
5 seconds).
4.
Move the control levers/knobs to the positions
shown.
5.
Disconnect the white jumper wire from the gray
program wire. The blower speed will change,
indicating completion of the calibration procedure.
6.
Confirm proper operation of controls. Repeat
procedure if necessary. When finished, tape
over program wire connector with electrical tape to
prevent accidental contact with chassis ground.
Control Panel
Calibration Procedure (Cont.)
OFF
ON
START
MODE
F
A
N
C
H
MODE
F
A
N
C
H