10
Step 10.
Upon complete, the system
will show the job report.
Below explains the various items in the job report:
[OK:01]
– indicates the number of copies passed in this process.
(1 in this example)
[NG:00]
– indicates the number of copies failed in this process.
(0 in this example)
[12m20s]
– indicates amount of time took for this process.
(12 minute and 20 seconds in this example)
[S 1 2 3 … E]
– indicates the port number.
“S”: Source Port;
“1 ~ 9”: Port 1 ~ 9;
“A ~ E”: Port 10 ~ 14;
(Source Port and Port 1, 2 are shown in this example)
[o, x, -]
– indicates the result for every individual port above.
“o” indicates OK;
“x” indicates NG;
“-” indicates port empty
(Port 1 is passed, and Port 2 are not used in this example)
OK:1 NG:0 [12m20s]
Press ENT to Cont,
S 1 2
o o -